
To stack the modules:
1.
Place the rear feet of the module that you are adding atop the previously added
module in the system stack, and slide it backward until its rear alignment pin
rests in the rear alignment slot on the previously added module.
Figure 2–1: Aligning pins with slots
Alignment pin (2)
Alignment slot (2)
2.
Lower the front of the module that you are adding so that its front alignment
pin rests in the front alignment slot on the previously added module.
3.
Repeats steps 1 and 2 for the remaining system modules.
2.2 Connecting the tubing
To connect the tubing to the detector:
1.
Connect the tubing from the column manager to the fixture labeled "IN".
Requirement:
There are two lengths of tubing in the kit. Connect the shorter
tubing with the smaller ID to "IN".
December 7, 2015, 715004730 Rev. A
Page 19