background image

 

Revision 1.1 

 

Page 22 

WL500 Draining Instructions 

 

       WARNING!

  

WL500 IS A HEAVY OBJECT. 

Use proper lifting aids and handling techniques to avoid injury.  Use assistance as single person 
lift could cause injury. Always drain before handling to reduce weight.   

Draining Notes 

There are 3 tanks and a booster pump circuit that must be drained in the WL500.  The cold still 
water circuit of the 

WL500 

consists of a 2 liter cold tank, a 1 liter pre-chill chamber and a 

booster pump circuit that is sealed and must be vented to drain.  The booster pump will have 
some water in the circuit that must be purged to remove it.  The sparkling chamber does not 
have a vent or drain port and must be dispensed until empty (pushing CO

2

 gas only out of the 

faucet) to clear the water from the sparkling chamber.  It is critical to clear the cold still water 
before draining the sparkling chamber to ensure the pump does not inject water back into the 
sparkling chamber.  The hot tank has a drain port and is the only tank that is open to 
atmosphere through the vent and faucet. 

 

Prior to draining the hot tank, turn off the green compressor/heater switch, and dispense 2 
liters of hot water from the machine.  As hot water is dispensed from the faucet of the unit, 
colder water will be introduced into the hot tank.  Since the green power switch is turned off, 
the heater will not energize and heat the incoming tap water.  Following this precaution 
prevents exposing personnel and equipment (drains, catch basin, etc.) to scalding hot water. 

 

Disable Cold and Hot Tanks

 

1.

 

Turn off the green power switch to disable the heater and compressor. 

2.

 

Dispense 2 liters of water through the hot tank to cool the water temperature in the hot 
tank and avoid burns.       

WARNING!  

VERY HOT WATER CAN BURN OR SCALD.

 

Hot water should be dispensed carefully into insulated container to avoid injury. 

 

 

Turn off Water Supply and Bleed Water Pressure 

3.

 

Isolate the unit from feed water by turning off the supply.  

4.

 

Dispense cold still water to relieve any pressure built up in the system. 

5.

 

Remove the water supply line from the unit. 

6.

 

Install dust cap or plug into water supply line bulkhead fitting. 

 

Drain the Cold Still Water Tanks and Circuit 

7.

 

Open front hatch panel by unscrewing the retaining screw in front of the faucet until it is 
flush with the faucet.  Slide front hatch panel up and out. 

8.

 

Remove the UV light cover plate and access the UV lamp and quarts sleeve. 

      WARNING!  

ULTRAVIOLET RADIATION

.  Protect your skin and eyes against ultraviolet 

rays.  Never look directly at an operating UV light. Disconnect UV lamp before removing.

 

9.

 

Unplug the UV lamp and remove UV lamp. 

10.

 

Remover the UV indicator sensor from the quartz sleeve retaining nut. 

11.

 

Unscrew the quartz sleeve retaining nut and remove quartz sleeve to vent the cold circuit. 

12.

 

Remove the cold tank drain line cap and drain the 2 liters into a container.   

13.

 

Remove the pre-chill drain line cap and drain the 1 liter of water from the pre-chill chamber 
and the booster pump circuit. 

14.

 

A total of 3 liters of cold still water will drain from the unit. 

 

Содержание WL500 - Sparkling

Страница 1: ...Waterlogic Commercial Products LLC 11710 Stonegate Circle Omaha NE 68164 800 288 1891 www waterlogic us WL500 Sparkling OPERATING INSTALLATION AND SERVICE MANUAL...

Страница 2: ...e TABLE OF CONTENTS Features and Benefits 3 Certifications 4 Introduction 5 Safety Alert Symbols 5 Safety Precautions 6 Warranty 7 Model and Part Designations 8 Specifications 8 Layout Drawing and Par...

Страница 3: ...Sensor and Drip Tray Full Fault Mode that halts supply to prevent overflow and sounds alarm to reduce accident potential Child Safeguard WL500 requires selection followed by main dispense and defaults...

Страница 4: ...o ANSI UL 399 Standard for Drinking Water Coolers BPA Free Waterlogic tests for BPA and declares that all of its products are Bisphenol A FREE and contain no harmful BPA plastics Waterlogic is certifi...

Страница 5: ...aterlogic and its affiliates are protected by patents issued or pending in the United States and other countries Waterlogic reserves the right to change the specifications referred to in this literatu...

Страница 6: ...ter the system The system is designed for the supplemental bactericidal treatment of either treated and disinfected public drinking water or other drinking water which has been tested and deemed accep...

Страница 7: ...ing documentation to Waterlogic for evaluation The form is available at www waterlogic us Supporting documentation must include but is not limited to proof of purchase installation date failure date a...

Страница 8: ...x 18 in x 10 in AK 0007 32 in x 12 in x 7 in Shipping Weight Dry 70 lb 32 kg AK 0005 35 lb AK 0007 9 lb Rated Service Flow Rated Capacity Service Life 0 5 gpm 1 89 lpm 2 000 Gallons or 6 months Same...

Страница 9: ...nly BIOCOTE WL LOGO same as PL 1222 10 7074 8 PL 1094 Side Panel Silver Plastic LH RH 10 7072 9 ST 8094 A Back Metal Panel 10 7051 10 EL 5005 Switch Heater Compressor Green I ON O OFF 10 3009 11 EL 50...

Страница 10: ...spense Button For Sparkling Water Press Sparkling Button 2 followed by the Main Dispense Button For Hot Water Press Hot Button 3 followed by the Main Dispensing Button For Extra Hot Water Press Extra...

Страница 11: ...Revision 1 1 Page 11 WL500 FLOW DIAGRAM...

Страница 12: ...r on the display and cold water will be dispensed when the Main Dispense Button is pressed Selecting COLD Button 1 and then pressing the Main Dispense Button opens Solenoids 2 and 4 which allows suppl...

Страница 13: ...the Main Dispensing Button for Premium Sparkling Water The unit will default back to COLD water after 3 seconds unless the Default Set is changed to Sparkling See Programming Section When the Main Dis...

Страница 14: ...imal sparkling water is generated with cold water under 46o F WL500 Sparkling Level Sensor Probe requires inspection and service See Service Section WL500 Sleep Mode The WL500 has programmable sleep m...

Страница 15: ...rade Language English The display will read in English Default is English Spanish The display will read in Spanish French Etc The display will read in French and many others Flow Counter Liters 4000 9...

Страница 16: ...ntil the option Language appears on the display 3 Press Button No 3 to select the Language option 4 Press Button No 2 repeatedly to scroll down through the languages until Spanish is displayed 5 Press...

Страница 17: ...Close the regulator outlet valve and secure in the base cabinet 5 Route a inch pipe from the outlet fitting of the CO2 regulator through the knock out up to the CO2 IN bulkhead fitting on the back of...

Страница 18: ...the Waterlogic WL500 and check exterior for damage WARNING WL500 IS HEAVY Use proper lifting aids and handling techniques to avoid injury Use assistance as single person lift could cause injury Always...

Страница 19: ...SONAL PROTECTIVE EQUIPMENT Always ensure proper ventilation and use proper personal protective equipment such as gloves and eye protection when using chemicals Refer to Material Safety Data Sheet for...

Страница 20: ...ion Required The first 2 or 3 gallons of water will contain concentrated sanitizer Use extreme care Fill the Sparkling Chamber with Sanitizer 20 The sanitizer solution will be injected into the sparkl...

Страница 21: ...nce the compressor starts the fan condenser also will start Verify the fan has started by feeling for the discharge of air at the rear grill of the machine Heat exchange is a signal that the refrigera...

Страница 22: ...sing personnel and equipment drains catch basin etc to scalding hot water Disable Cold and Hot Tanks 1 Turn off the green power switch to disable the heater and compressor 2 Dispense 2 liters of water...

Страница 23: ...e PRV on top of the sparkling chamber to vent the system May remove top cover to access 21 Remember to close the Pressure Relief Valve once all pressure is relieved 22 Remove the CO2 supply line from...

Страница 24: ...Never expose to freezing temperatures Ensure there is adequate clearance around the unit to allow refrigeration system condenser to dissipate heat Warmer environments require more clearance around the...

Страница 25: ...e dispensing faucet press the hot button Button 3 followed by the main dispensing button until a continuous flow of water is obtained Once a continuous flow is obtained release the main dispensing but...

Страница 26: ...ater below 46O F into the chamber This provides Premium Sparkling Water Sample the sparkling water to ensure it meets expectation 16 Check the unit for any leaks External Leak Protection is always rec...

Страница 27: ...abrasive cloth to clean Inspect the Quartz Sleeve O ring CT 2006 for wear or damage and replace as necessary 4 Test UV lamp and UV sensor CDS is working by removing the sensor from the retaining nut a...

Страница 28: ...ONAL PROTECTIVE EQUIPMENT REQUIRED Always ensure proper ventilation and use rubber or nitrile gloves and eye protection when using chemicals Refer to Material Safety Data Sheet for specific requiremen...

Страница 29: ...embly Part Number is HT 3021 INN 10 7082 Sparkling Chamber Level Sensor Probe Assembly CT 2023 WL500 Sparkling chamber has a level sensor probe that needs to be maintained and descaled at every filter...

Страница 30: ...Revision 1 1 Page 30 WL500 MAIN PARTS DRAWING...

Страница 31: ...p Fixing Rubber Silicon 10 3004 16 CT 2045 UV Lamp 8W with wires 10 7020 17 CT 2006 O ring Black Quartz Sleeve 10 2500 18 CT 2002 Quartz Sleeve D310mm for 8W Lamp 10 1400 19 CT 2001 C Cold Tank Retain...

Страница 32: ...2039 A CT 2028 Drain valve Cap Only for both 1 4 5 16 Drains CT 2028 48 PU 4028 JG Bulkhead Connector Union 1 4 1 4 PI1208S 10 3067 49 PL 1094 Side Panel Silver 10 7072 50 CT 2035 D AQ Q Pump With Co...

Страница 33: ...Revision 1 1 Page 33 WL500 WETTED PARTS DRAWING...

Страница 34: ...E 08 BI 1000F B 19 1054 17 PU 4008 JG Equal Elbow Connector 1 4 PI0308S PU 4008 18 PU 4008 JG Equal Elbow Connector 1 4 PI0308S PU 4008 19 PU 4031 JG LLD PE Tube Blue O D 1 4 PE 08 BI 1000F B 19 1054...

Страница 35: ...DPE Tube Blue 8mm PE 0806 100M B 10 3062 51 PL 1088 Stainless Steel Insert for Faucet WL850 Sparkling with SUS 10 2701 52 PL 1011 Faucet HC CA 10 2700 53 CT 2007 Natural Faucet O Ring Silicon White 10...

Страница 36: ...utes and there is not a signal from the level sensor to shut off the pump This is a safety feature to prevent the pump from being damaged When operating properly it should take about 1 1 2 minutes for...

Страница 37: ...Revision 1 1 Page 37 WL500 ELECTRICAL DIAGRAM DANGER HIGH VOLTAGE ELECTRICAL HAZARD PCB Printed Circuit Board contains High Voltage Only trained and qualified technicians should attempt live testing...

Страница 38: ...nt lip has only 2 holes Step 3 Fasten the front door and frame assembly to the front edges of the top and base panels Top panel and base panel edges fit inside of door assembly edges Screw Locations 5...

Страница 39: ...ar Align the side panels using the plastic tabs which will protrude through the metal frame WL500 to Base Cabinet Attachment Point Use locking screw provided or ST 8016 adjustable foot Step 5 Front Bl...

Страница 40: ...l into the base cabinet Note that this task will require a little maneuvering of the insert panel for proper alignment Take care not to break the plastic tabs on the insert panel Step 3 Fasten the cup...

Отзывы: