background image

14

Waterford TARA T25 Direct Vent Freestanding Gas Stove

DV STOVE HORIZONTAL VENT KIT (#946-116 & #946-216) INSTALLATION

Review the following sequence of instructions
which are typical of most installations. The
sequence may vary depending on wall thick-
ness. 

Refer to pages 11 to 18 for vent

location and clearance dimensions.

1) Set the unit in its desired location. Check to

determine if wall studs will be in the way of
the venting system, adjust location until all
clearances are met and there are no ob-
structions.

c) Attach the 2 piece adjustable pipe

section to the vent terminal and slide
into position from the exterior. 

The

larger diameter end of the ad-
justable pipe goes to the vent
terminal.

d) Install the 90

o

 elbow onto the adjusta-

ble pipe  to determine the vertical
centerline.

Note: if the centerline cannot be
met, the adjustable sections will
have to be cut.

e) Cut the 2 ft. or 4 ft. section of rigid pipe

to length. Attach the  45

o

 elbow to the

rigid pipe, and ensure that the pipe
length when cut  (with the 45

o

 elbow)

will seat onto both the starter collar
and the 90

o

 elbow. 

 Crimped sec-

tion of rigid pipe seats into the 90

o

elbow. Only cut the uncrimped
side of pipe.

Dismantle all pipe sections including vent
terminal.

3) Attach the 4" dia. flex liner to the vent

terminal ensuring that the flex overlaps
the collar of the vent terminal by a minimum

Note: A 1-1/2"(38mm) clearance around

the outer pipe must be maintained
except that only a 1" (25mm) clear-
ance is needed at the termination
end.

IMPORTANT:
Do not locate termination hood
where excessive snow or ice build-
up may occur. Be sure to check
vent termination area after snow
falls, and clear to prevent acciden-
tal blockage of venting system.
When using snow blowers, make
sure snow is not directed towards
vent termination area.

2) Assemble a 

trial fit

 to determine the ver-

tical center-line for the vent termination.

a) Cut a 9-1/2" x 9-1/2" (241mm x 241 mm)

square hole on both the interior and
exterior wall.

b) Install wall thimbles on both interior and

exterior wall with 4 wood screws (#8
x 1") per thimble.

DV STOVE HORIZONTAL VENT KIT

DV Stove Horizontal Vent Kit (2 ft. Part # 946-116 or 4 ft. Part # 946-216) includes all the parts needed
to install the  U29-2 or U45-3 with  minimum horizontal and vertical vent dimensions. For installations
that require longer vertical and/or horizontal vents use the Dura-Vent system as shown on page 18.

    Qty. Description
1)

1 Rigid Pipe Section (Kit # 946-116: 2 ft. (1.2m) length,

Kit # 946-216: 4 ft. (1.2m) length), 6-1/2" (165mm) inside diameter

2)

1 Flex Liner, compressed aluminium 2 ply liner,

4" (102mm) inside diameter

3)

4 spring spacers

4)

1 90 deg. Elbow

5)

1 Adjustable pipe section 13-1/2" to 24" (343mm x 610mm), 2 pieces

6)

1 Thimble Cover

7)

1 Wall Thimble (2 pcs.)

8)

1 Adapter

9)

1

AstroCap

 Termination Cap

10)

2 Trim Collar

11)

1 tube of Mill-Pac, high temperature sealant

12)

12 Screws, #8 x 1/2" Self tapping, Stainless Steel

13)

14 Screws, #8 x 1/2" Self tapping, Black

14)

4 Screws #8 x 1-1/2" Drill Point, Black

15)

4 Screws #8 x 1-1/2" Drill Point, Stainless Steel

16)

8 Wood screws #8 x 1"

Required but not included in above Kit:
45

o

 Elbow (Part #: 946-214)

Note:
a) Liner sections should be con-

tinuous without any joints or
seams.

b) This is an approved system,

therefore components in this
system must not be substi-
tuted for any other manufac-
turer's products.

INSTALLATION

Содержание TARA T25-LP

Страница 1: ...the gas supplier FOR YOUR SAFETY What to do if you smell gas Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas suppli...

Страница 2: ...h TheTARAhasbeen approved by Warnock Hersey for both safety and efficiency As it also bears our own mark it promises to provide you with economy comfort and security for many trouble free years to fol...

Страница 3: ...Label Safety Labels 4 Installation Information for Mobile Manufactured Home After First Sale 5 Before You Start 5 Manufactured Mobile Home Requirements 6 General Safety Information 6 Installation Chec...

Страница 4: ...l for TARA T25 Gas Stove NOTE Waterford units are constantly being improved Check the label on the unit and if there is a difference the label on the unit is the correct one For the State of Massachus...

Страница 5: ...A QUALIFIED SERVICE PERSON MORE FREQUENT CLEANING MAY BE REQUIRED DUE TO EXCESSIVE LINT FROM CARPETING ETC IT IS IMPERATIVE THAT THE CONTROL COMPARTMENT BURNERS AND CIRCULATINGAIRPASSAGEWAYS BEFORE YO...

Страница 6: ...on More frequent cleaning may be re quiredduetoexcessivelintfromcarpeting bedding material etc It is imperative that control compartments and circulating air passageways of the appliance be kept clean...

Страница 7: ...ct the red and black wires from the wire harness to speed controller NOTE Speed control wires must be in the down position when control panel is in place INSTALLATION Use the minimum clearances shown...

Страница 8: ...Pull excess wire next to fan to avoid excessive heat from the firebox 11 Slide the thermodisc into the bracket clip on the underside of the firebox NOTE When power cord is plugged in speed control is...

Страница 9: ...in the Exterior Vent Terminal Locations diagram on page 10 INSTALLATION PRECAUTIONS These venting systems are engineered prod ucts that have been designed and tested for use with the Tara Thewarranty...

Страница 10: ...ter regulator assembly within 3 90cm horizontally from the centerline of the regulator J Clearance to service regulator vent outlet min 36 90cm K Clearance to non mechanical air supply inlet to buildi...

Страница 11: ...h the wall ensure that ALL vent and termination clearances see page 10 will be met The venting arrangements shown on the dia gram have a minimum of 75 flue loss efficiency with Fan Off as required for...

Страница 12: ...e same installation procedures as used for standard Horizon tal Termination NEVER install the snorkel upside down Diagram 1 Dia 2a 2b As speci fied in CGA B149 Instal lationCode Localcodes or regulati...

Страница 13: ...and the vent cap by attaching the two sheet metal strips extending from the Riser Vent Back ingPlateintotheouterwalloftheventpipe Use two aluminum screws provided to connectthestripstothepipesection B...

Страница 14: ...ild up may occur Be sure to check vent termination area after snow falls and clear to prevent acciden tal blockage of venting system When using snow blowers make sure snow is not directed towards vent...

Страница 15: ...e 4 dia flex liner out fully and get a trial fit of the liner onto the 4 dia starter collar 8 Cut the 4 dia flex liner to the desired size Hint leaveanextra12 to16 oflength this will make the final as...

Страница 16: ...our particular installa tion See page 15 for a list of vent parts If installing termination on a siding covered wall a vinyl siding standoff or furring strips can be used in order to ensure that the t...

Страница 17: ...5O Elbow Swivel Black 945BG N A N A 90O Elbow Galvinized 990 4DT EL90S 4D90LS 90O Elbow Black 990B 4DT EL90SB 4D90LBS 90O Elbow Swivel Galvinized 990G N A N A 90O Elbow Swivel Black 990BG N A N A Ceil...

Страница 18: ...CLOSED in a chase min size 9 x 9 maintain a 1 1 4 clearance to combustibles Offset to Vertical Terminations Vent Restrictor must be set at 5 8 for this venting installation Straight Vertical Terminati...

Страница 19: ...pipes and fittings by ori enting the four pipe indentations so they match and slide in to the four entry slots on the male ends dia gram1 Pushthepipesectionscom pletely together thentwist lockone sect...

Страница 20: ...enetrate the roof Determine if ceiling joists roof rafters or other framingwillobstructthevent ing system You may wish to relocate the applianceortooffset asshownindiagram 6 to avoid cutting load bear...

Страница 21: ...10 INSTALLATION b Any occupied areas above the first floor including closets and storage spaces through which the vertical vent passes must be enclosed Support Extensions Round RDSE or Square SQSE St...

Страница 22: ...76mm Connect the flex pipe to the Retro Connector by slipping it into the 4 3 4 diametersleeveonthetopsideofthe Connector Use 3 sheet metal screws to assemble these two parts 6 Push the flex pipe bac...

Страница 23: ...Diagram 9 9 Slide the Wall Thimble Cover Part 940 over the Retro Connector and secure with masonry bolts Diagram 10 If you have a framed wall in front of the masonry use wood screws to mount the Wall...

Страница 24: ...es Since somemunicipalitieshaveadditionallocalcodes it is always best to consult with your local authorities and the CAN CGA B149 installation codes ForUSAinstallationsfollowlocalcodesand or the curre...

Страница 25: ...rner onto the burner injector The burner air shutter gears must be aligned Check to make sure that the two gears engageeachotherbyatleasttwo thirdsof their thickness If not it will be necessary to dis...

Страница 26: ...g pins in the locating tabs AERATION ADJUSTMENT Theburneraerationisfactorysetbutmayneed adjusting due to either the local gas supply air supplyoraltitude Theflamesshouldnotextend to the top of the fir...

Страница 27: ...5 logs in the set 1 Rear Log 1 Front Log 1 Middle Log and 2 Top Logs The logs are fragile handle with care DONOT FORCEinto position 1 RemovetheCastIronFrontPanel seepage 26 2 Remove the Front Glass P...

Страница 28: ...to the product that causes sooting or carboning that results in damage to the exterior facia is not the responsibility of the manufacturer Thermostat Wire Table The remote control kit comes with a han...

Страница 29: ...oturn on the unit 6 Rotate the flame height regulator to adjust the flame height higher or lower SHUTDOWN PROCEDURE 1 Usethethermostatorremotecontroltoturn off the main burner 2 Turn the main gas cont...

Страница 30: ...nt gauge material from the rest of the firebox and body Therefore the varying thick nesses of steel will expand and contract at slightly different rates which can cause tick ing and cracking sounds Yo...

Страница 31: ...er operate the appliance without the glass properly secured in place or with the door open 9 Periodically check the pilot flames Correct flamepatternhasthreestrongblueflames 1 flowing around the therm...

Страница 32: ...impact purchase your replacement door from an authorized Waterford dealer only and follow our step by step instructions for re placement Replacement Part W260040 Tara Glass WARNING Do not operate app...

Страница 33: ...2081 Hob Casting Black 30 W260260 Top Relief Frame Gasket 31 942 117 Top Relief Plate Frame 32 W260280 Top Relief Plate Gasket 33 290 021 Air Baffle Plate 41 W260061 Side Casting Black 42 W420011 Leg...

Страница 34: ...____________________________ ______________________________________________________ _______________________________________________________________ ____________________________________________________...

Страница 35: ...ned to FPI and evaluated for manufacturer defect The authorized selling dealer is responsible for all in field service work carried out on your Waterford product FPI will not be liable for results or...

Страница 36: ..._______________________________________________ Printed in Canada Waterford fireplace products are designed with reliability and simplicity in mind In addition our internal Quality Assurance Team care...

Отзывы: