CK and EQ Manual
Page 7
STEP 1CS
OEM Cycle Sequence
OEM Cycle Sequence instructions allows the OEM to set the order of
the cycle. The OEM Softener System Setup or the OEM Filter System
Setup allow the OEM to set how long cycles will last. The OEM may
choose up to 9 cycles in any order. END must be used as the last
cycle option. The SERVICE cycle should only be used in brine prefill
applications.
The following is an example of how to set a valve so that when regeneration is initiated BACKWASH occurs first, dn BRINE
occurs second, RINSE occurs third, and FILL occurs fourth.
Step 1CS – Press NEXT and
▼
simultaneously for 3 seconds and release. Then press NEXT and
▼
simultaneously for 3 seconds and release. If screen in Step 2CS does not appear in 5 seconds the lock
on the valve is activated. To unlock press
▼
, NEXT,
▲
, and CLOCK in sequence, then press NEXT
and
▼
simultaneously for 3 seconds and release. Then press NEXT and
▼
simultaneously for 3
seconds and release.
Step 2CS – Use
▲
or
▼
to select 1.0 for 1” valve, 1.25 for 1.25” valve, 1.5 for 1.5” valve, 2.0 for 2”
valve, or 1.0T for twin valve.
Press NEXT to go to Step 3CS. Press REGEN to return to exit OEM Cycle Sequence.
Step 3CS – When 2.0 is selected, an additional screen will appear. It is used to select which size flow
meter is to be used with the valve, 1.5, 2.0 or 3.0.
Press NEXT to go to Step 4CS.
Press REGEN to return to previous step.
STEP 2CS
Cycle Options
BACKWASH DN BRINE FILL
END
RINSE
UP BRINE SOFTENING
OR FILTERING
STEP 3CS