9
Typical Installation
■■■✦■■■
Temperature & Pressure
Relief Valve
Union
(The addition of a union at
this point will help in the
replacement of the T & P Relief
Valve should the need arise.)
Drain Pipe -(3/4" minimum)
Drain Valve
Support the relief valve drain pipe
using metal strapping or wire
fastened to the structure overhead
Seal Ring
(Inside nut)
Hex Union Nut
(Relief Valve)
No threads permitted
on end of Drain Pipe.
6” Maximum distance from
drain pipe to suitable open
drain.
Cold Inlet Shut Off
Thermal Expansion
Tank (if required)
See thermal
expansion section
on page 6.
Heat Trap 6"
Minimum
Pre-solder 12" minimum
stub pipes before installing
to unit.
Hot Water Outlet
Top of Water Heater Junction
Box
Drain Pan
Содержание 15
Страница 20: ...Replacement Parts 15 20 gallon models 20...