34
Location of Leak
Action Taken
Location of Fitting
if Repaired
Passed Pressure
Test ?
Yes / No
Yes / No
Yes / No
Yes / No
I
of
hereby declare that the UFH system has been installed and fully commissioned in
accordance with the guidelines set out within this installation manual
Signed:
Date:
Plumber
Electrician
Name:
Name:
Company:
Company:
Address:
Address:
Postcode:
Postcode:
Tel:
Tel:
Email:
Email:
Project Ref:
Project Ref:
Circuit
Number
Room
Served
Zone
Number
Circuit
Length
Circuit Flow
Rate (l/min)
Pressure test
passed?
1
2
3
4
5
6
7
8
9
10
11
12
Installer Details
Manifold
Location
Temperature
Setting
Purged and
Filled ?
Pressure Test
Completed ?
Circuits
Balanced ?
Fully
Operational
Installation Details
Declaration
NOTE:
Failure to present this commissioning log (accurately completed with
declaration signed), upon request, will void system warranty.
Commissioning Log
Содержание WHS-M-S3-Series
Страница 15: ...15 ...
Страница 29: ...29 ...
Страница 33: ...33 NOTE Draw a plan showing the layout and location of the heating circuits Layout Plan ...