14 June 2016
Due to continued product improvement, Warmington Ind LTD reserves the right to change product specifications without prior notification.
All Dimension are in mm
10
PROCEDURE FOR THE TEST AND COMISSIONING OF YOUR DECORATIVE FIRE.
Ensure Gas Supply and the Power Supply (caution 240V) to the Unit.
Refer to Data Plate on this Specification for settings. The Data Plate is attached to the under carriage of
the Burner.
Remove Front Grate ensure the CAT5 cable to the Control Receiver is still connected.
Loosen the Jet Test point and attach manometer (Digital is preferred). The Test Point is on the Right
Hand Side of the Gas Burner, as Shown Below.
Light Appliance, adjust to High Flame setting and check pressure, adjust to Low Flame and check pres-
sure.
NOTE: If setting the Pressure is required it is to be carried out by a Certified Gas Fitter.
If adjustments are necessary, remove the cap. The Pressure Adjustment Screw and Nut are on the Front
Side of the Gas Control Valve (shown in Diagram
B
in this specification) and are
Factory
set.
High Pressure Setting
: Set the modulator to Maximum Condition. Screw in
Nut A
to Increase the Outlet Pres-
sure then screw Nut A out to Decrease the Pressure to the desired settings. Use 10mm spanner.
Low Pressure Setting:
Turn Off the Power to the Modulator and keep Nut A stationary. Use a screwdriver to
screw in
Screw B
to Increase the Pressure and Screw it Out to Decrease the Pressure. Carefully replace the
Modulator Plastic Cap.
WARNING:
To ensure the Correct Operation of the Modulator it is necessary that the Plastic Cap is returned to
its original location.
Gas Test Nipple
for SG/EG Fires