PLAN, FRONT ELEVATION & CROSS SECTION
This is a general installation guide only
–
Contact a “NZHHA Installer” for Installation Advice.
See : www.homeheat.co.nz , choose “members” & pick your Area & Fire type (wood / Gas etc) this will provide you with a
NZHHA Certified Installer (use the SFAIT Installers Only .)
HEARTH & PLINTH CONSTRUCTION DETAILS
1.
All the dimensions are minimums
2.
Fit the Plinth into position in the Cavity. If onto a wooden floor ensure that an insulating plinth is fitted as per
the specifications.
Ensure that the plinth is elevated to allow for finishing on the hearth. (See Hearth
and plinth details)
3.
Fit the firebox into the Cavity. Bolt the fire box to the plinth or through to the floor with the bolting point
provided on the Left and Right hand sides of the fire box (seismic restraints).
4.
Fit the Adaptor to the Fire box. Ensure that exhaust sealant is used between the fire and Adaptor. Bolt into
position with the bolt in the Left and right hand sides of the Fire box.
5.
Install the flue system.
6.
Fit the Hebel Heat cell around the fire. A general minimum lay out is shown in this Specification.
FIREBOX INSTALLATION
Note: Hearth and Plinth Construction.
For Combustible Flooring an Insulating Hearth and Plinth
of 75mm ACC is required.
Plinth to be Offset above Hearth by the Hearth Finishing’s
( e.g. Tiles / Granite / Solid Plaster / etc )
All Load Bearing Canter Levered Hearths must be
Engineered to carry loads .
IMPORTANT NOTE :
Offset
Offset for
Hearth
finishing
*Note: If Solid Plastering the structure , it is recommended to use a Fibreglass Mesh with a Latex Based Solid Plaster
to minimise the chance of the Solid Plaster cracking. (See your Solid Plasterer for correct materials and applications) .
This is an example of a Raised & Canter
Levered Hearth. See Spec for details
This Hearth
& Plinth
setup is at
Floor Level