Maintenance: Schedule
T7M7G6M,00006A1 -19-29AUG21-2/3
T7M7G6M,00006A1 -19-29AUG21-3/3
4. Check control valve mounting M16 bolts (2). Torque
to specification.
5. Check the condition of the tilt frame pins and bushes.
6. Check feed roller arm and upper delimb knife pins and
pin collar, (if in softwood applications). (See Pins.)
7. Clean top saw housing area. Thoroughly clean the
saw bar cavity of any debris, check saw assembly
mounting and top saw motor mounting bolts. Torque
(1/2-in. UNC) bolts to specification.
8. Torque main saw supercut option (M10) bolts to
specification..
9.
Torque main saw supercut option (M12) bolts to
specification.
10. Torque main saw 3/4-in. option (1/2-in. UNF) bolts
to specification.
2— Control valve mounting
M16 bolt (3 used)
2
2
2
TX1056738
—UN—05MAR09
Control valve bracket
11. Torque feed roller mount bolts (3), to specification.
12. Torque feed roller nuts (4), to specification.
13. Grease main saw, feed out rack, and bearing if
supercut saw option fitted or swing arm bearing if
3/4-in. saw option fitted. (See Fluids and Lubricants.)
14. Remove plate and visually check rotator pinion grease
level. Apply grease as required. Inspect pinion and
gear faces. Replace when worn. (See Rotator.)
15. Grease fixed feed motor splines and re-shim motor (if
in hardwood applications). (See Feed Rollers.)
3— Feed roller mount bolt (16
used)
4— Feed roller nut (12 used)
4
3
TX1061599
—UN—08JUL09
Feed roller bolts and nuts
3-2-6
090721
PN=63
Содержание HTH618C
Страница 2: ......
Страница 91: ...Index Index 3 090721 PN 91 ...
Страница 92: ...Index Index 4 090721 PN 92 ...