WWW.
WAMBAM
FENCE.COM
8
ASSEMBLY
INSTRUCTIONS
BL19101
STEP 3
:
INSTALL
BRACKETS AND BOTTOM RAILS
Note:
The ground can be dug out about
3” to 4” to allow post bottoms to sit below
the ground if necessary.
Adjust the bottom and top donuts
to compensate for a crooked pipe
anchor.
Install (1) Bracket
(G)
on the post approximately
2” off the ground using (4) 1” Self-Drilling Stain
-
less Steel Screws
(H)
.
Place the second bracket over the opposite
end of the Bottom Rail
(E)
and slide the rail
down into the bracket on the opposing side.
Note:
There could be a slight conflict between
the head of the exposed screw and the end of the
rail in a tight fitting application. The end of the rail
can be notched to accommodate.
Slide the Posts
(B)
down over the
donuts.
STEP 2.4
STEP 3.1
STEP 3.2
STEP 2.5
B
G
E
H
2”