Walvoil DPC130X Скачать руководство пользователя страница 13

D1WWTD02E

13

Service Manual

DPC130X

_____________________________________________________________

Disassembly and assembly procedures

Disassembly and assembly should be carried out by Walvoil technicians. In case the control valve doesn’t work properly, we advise 
you to contact our After-sales Department.
However in case the disassembly and assembly operations are absolutely unavoidable, you must observe the following prescrip-

tions and assign these operations to highly qualified technicians in the field of hydraulics.

Do not disassembe the control valve when an explosive atmosphere is present and the control valve surface temperature is outside 

the environmental temperature range as specified before (see page 9).

• The valve can keep high internal pressure; release the inside pressure and make sure that all machine actuators are in a rest 

position before removing the piping. In any case unscrew safely and carefully connections and fittings, so to avoid a fall of load or 
high-temperature hydraulic fluid jet. Remind to wear the safety equipment and goggles;

• do not remove electrical parts by removing the cable or by opening these components; in case these operations are absolutely 
unavoidable, please contact out After-sales Department;
• since hydraulic devices are all precisely machined with very accurate clearances, carry out the disassembly and assembly work 
in a clean place;
• make sure to prevent dust, sand and other similar powder materials from entering into the device;
• before removing the hoses, attach suitable indications on them so to be able to locate their positions later on. It is also advisable 
to label dismounted parts and to write down their original location;
• before disassembling, read and strictly observe the assembly/disassemby instructions (shown in the following paragraph).
• since disassembled parts might show rust, apply them anticorrosive oil and seal them;
• before assembling the control valve on the operating machine, again make sure it has not been affected by the various hydraulic 
tests (e.g. relief valve setting, leak test...).

First phase: preassembling

• Collect tie rods kit according to the BOM.
• Collect inlet plate, sections and endplate according to the BOM.
• Collect OR kits according to the BOM.
• Clean carefully grinded planes. 
• Starting from the inlet plate, screw by hand the tie rods (from the side of the shorter thread) on the inlet plate.
• Mount the working sections according to the scheme.
• Mount the end plate.
• Put on the spring-washers on the tie rods and screw the nuts by hands.

• Settle the control valve elements on a rigid plane and finally screw the nuts to the torque of 30 Nm - 

22 lbft

.

(A) Assembling kit

For valve with:

With inlet section type

BR-BN-BRS

Part code

With inlet section type BRF

Part code

1 working section

5TIR108185

5TIR108153

2 working sections

5TIR108232

5TIR108201

3 working sections

5TIR108281

5TIR108249

4 working sections

5TIR108328

5TIR108297

5 working sections

5TIR108376

5TIR108339

6 working sections

5TIR108425

5TIR108393

7 working sections

5TIR108472

5TIR108440

8 working sections

5TIR108520

5TIR108488

9 working sections

5TIR108568

5TIR108536

10 working sections

5TIR108616

5TIR108584

A

A

Содержание DPC130X

Страница 1: ...DPC130X Pre compensated Load Sensing Sectional Valve ATEX version...

Страница 2: ...FOR ANY RESULTING INJURY OR DAMAGE TO PERSONS OR PROPERTY Whenever the symbols shown below appear follow the instructions that are given Be sure to perform all operations and maintenance in complete...

Страница 3: ...DPC130X _________________________________________________________________________________________ Table of contents Introduction page 4 Valve description page 5 General specifications page 9 Storage p...

Страница 4: ...e product you must read this Service Manual carefully and understand its contents in order to prevent accidents or damages Do not carry out assembly disassembly and or maintenance activities before co...

Страница 5: ..._____________________ Valve description Operating principle of Pre Compensated Load Sensing technology The main feature of this principle is that the flow rate to the user is proportional to the spool...

Страница 6: ...to which Group the product belong and determine the category inside the Group Areas Gas Air type explosive mixture G Dust Air type explosive mixture D With the Atex Directive 2014 34 UE for the safety...

Страница 7: ...tions for breakdown in case of explosion These products have to work in compliance with operative parameters established by the Manufacturer in environments with a high probabi lity of frequent or lon...

Страница 8: ...0 60 C T fluid 20 80 C Via Adige 13 D 42124 Reggio E Italy CE mark DATAMATRIX ATEX mark manufacturer reference ATEX category environmental temperature fluid temperature E F 230 9 06 54 5 2 15 5 0 197...

Страница 9: ...ng range from 15 to 75 mm2 s from 15 to 75 cSt min 12 mm2 s 12 cSt max 400 mm2 s 400 cSt Contamination level max 18 15 ISO 4406 NAS 1638 class 9 Environmental temperature for working conditions from 2...

Страница 10: ...WARNING WARNING Cast iron O ring seals Parback Spring steel Other steel Other Cast iron EN GJl 250 NBR 70 Sh AISI 302 11SMnPb37 Sint A50 Cast iron EN GJL 300 VITON 75 Sh VDSiCr EN10270 2 16CrNi4Pb Ca...

Страница 11: ...on of the hydraulic schema especially in case of electrohydraulic control be sure that drain line is directly connected to tank avoid any back pressure in case of variable displacement system be sure...

Страница 12: ...case of the presence of electrohydraulic controls or unloading valve please cover these electronic parts as well as the cables before painting avoid painting the marking label for the electric parts...

Страница 13: ...device before removing the hoses attach suitable indications on them so to be able to locate their positions later on It is also advisable to label dismounted parts and to write down their original l...

Страница 14: ...ction screw by hand the tie rods from the side of shorter thread on the inlet section mount the working sections according to the scheme mount the outlet section put on the spring washers on the tie r...

Страница 15: ...ces Periodically check the tightening of Tie rods Lever box Control kit screws Unloading screw Electrohydraulic valve screws Hydraulic fittings Constantly check oil contamination status and plant filt...

Страница 16: ...WWW WALVOIL COM 1st edition September 2018 D1WWTD02E...

Отзывы: