P 5
Please retain product label and instructions for future reference
23
23
23
13
Step 5
Position the support bar across the
building from the left window panel
upright framing to the opposite
framing on the plain panel right as
shown in the diagram.
Fix the support bar the framing on
both panels using the L bracket and
4x30mm screws per bracket as shown
in the bubble diagram.
8x30mm Screws
30mm
screw
Pre drill
hole
13
9
10
11
11
12
Step 6
Layout the roof sheet and
position the roof framing
onto the sheet as shown in
the diagram.
Ensure the framing is level
around the edges and fix
into place using 30mm
screws.
* It is recommended to cut
the felt sheets before
fixing the roof to the
building.
17x30mm Screws
30mm
screw
Pre drill
hole
Step 7
Place the roof section on top
of the building, ensure the
roof framing slots over each
side.
Fix the roof onto the panels using
40mm screws making sure
they line up with the internal
framing.
Screw 6x60mm screws through the
roof and into the support bar.
21x40mm screws
6x60mm screws
40mm
screw
Pre drill
hole
60mm
screw