It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
AFTER TREATMENT:
score around protective
cover on glazing and
carefuly peel
covering back
Please retain product label and instructions for future reference
Step 12
Attach the rain guards to the
building, fixing in place above
each window using 3x60mm
screws per guard.
6x60mm Screws
60mm
screw
Pre drill
hole
24
Step 13
Fix the rear cover trimsto the
back of the building, aligning
with the edge of the panel.
6x40mm Screws
40mm
screw
Pre drill
hole
25
25
Step 14
Attach the larger rain guard
above the door, fixing in place
using 3x60mm screws.
6x60mm Screws
60mm
screw
Pre drill
hole
26