Felt 

tacks 

1

2

50

mm

50

mm

50

mm

3020mm

1000mm

1420mm

50

mm

Step 8

Cut three strips from the roll of felt, 

2x3020mm and 1x1420mm in length. 

Place felt on top of roof sheet and 

align as shown in diagram ensuring 

strip 3 over hangs the front by 50mm. 

with equal spacing at each corner. 

*Ensure strip 1 is the first piece 

placed down then lay sheet 2 and 

then 3. Make sure each sheet 

overlaps the next by at least 100mm 

creating a run off.

Use a fascia as a guide to mark out  

the angled cuts including 50mm 

overhang.

Cut the sides as shown in diagram at 

the dotted lines, use fascia width as a 

cutting guide. Cut the triangle with 

50mm overhang again using fascia as 

a guide.

100x Felt Tacks

17

Fr

ont

Corner

Corner

Triangle

3

16

16

16

16                                                                                                                            

Step 9

Attach the cover trims as 

shown using 3x40mm 

screws per cover trim.

12x40mm Screws

40mm 

screw

Pre drill 

hole

Step 10

Fit the fascias to the 

building over the felt and 

secure in place with 40mm 

screws as shown. Cut to 

length where necessary.

Pre drill to avoid splitting. 

Make sure the fascias at 

the back of the building fit 

lower than the roof height 

to allow water to run off.

17x40mm Screws

15

14

15

15

14

40mm 

screw

Pre drill 

hole

*

Cut down 

trims to fit

Step 11

Attach the two turn 

buttons to the slave door 

using 2x16mm screws.

* These turn buttons help 

to keep your doors 

straight during high and 

low levels of moisture 

content in the air.

2x16mm Screws

Pre drill 

hole

16mm 

screw

Sla

ve D

oor

Lock
ing D

oor

Содержание 03COR0707-V4

Страница 1: ...ssible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect...

Страница 2: ...f Frame 28 x 28 x 2025mm QTY 1 FS2828 2025MM 10 11 Roof Frame 28 x 28 x 1149mm QTY 2 FS2828 1149MM 12 Roof Frame 28 x 28 x 1196mm QTY 1 FS2828 1196MM 13 Roof Support 44 x 58 x 1906mm QTY 1 F4458 1906M...

Страница 3: ...crews 19 1 7 8 Pre Assembly Position press lock on the door align with key hole and fix into position using 4 x 10mm screws Then fit barrel bolts to top and bottom of the door as shown in diagram Use...

Страница 4: ...e fitting instructions Pre drill hole 60mm screw Step 2 Fix the window panels and the door panel with 6x60mm screws as shown in the diagram 6x60mm Screws 2 2 1 4 17 Step 3 Place rear panel left agains...

Страница 5: ...1 12 Step 6 Layout the roof sheet and position the roof framing onto the sheet as shown in the diagram Ensure the framing is level around the edges and fix into place using 30mm screws It is recommend...

Страница 6: ...the dotted lines use fascia width as a cutting guide Cut the triangle with 50mm overhang again using fascia as a guide 100x Felt Tacks 17 F r o n t Corner Corner Triangle 3 16 16 16 16 Step 9 Attach...

Страница 7: ...e reference Step 12 Attach the rain guards to the building fixing in place above each window using 3x60mm screws per guard 6x60mm Screws 60mm screw Pre drill hole 24 Step 13 Fix the rear cover trimsto...

Отзывы: