More than one torque support is used in the case of highly asymmetric tools. 
This torque support is affixed outside the parking station in the area around the customer structure. 
In order for the tool to be aligned across the parking station, the horizontal alignment of the 
tool side should also be checked and adjusted (similar to the horizontal parking station). 
Aligning is carried out when the different torque supports are adjusted accordingly. 

Adjusting the torque supports as well as monitoring and measuring the optimal position of the

 

tool takes place as often as required until the optimal position of the tool is achieved. 

Always measure out and check the optimal position of the tool as a final step. 

4.5.5 

Step 5: Insert spacer bushes (recreate floating bearing) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

At the end it is absolutely imperative 
that the 2 levelling bushes are 
replaced by the 2 spacer bushes. 

This is important as the floating

 

bearing is available once more, 
meaning that parking the tool

 

sides into the parking station

 

can correctly take place

 

once again. 

This applies for the horizontal and 
vertical parking station. 

Do not lose the

 

levelling bushes. 

Remove screws from

 

both levelling bushes 

Attach screws

 

with both spacer bushes 

Содержание 95813

Страница 1: ...1 Quick Guide Installation of the Tool Parking Station for Walther Tool Changing System Type 95813 95814 95815 95816 95817 95818 Ident Nr Dokument 135560 I...

Страница 2: ...king method and the safety instructions of the tool parking station during the operation of the tool parking station no safety devices are removed and or deactivated On completion of the assembly and...

Страница 3: ...is not properly affixed to its location No tool sides must be stored in the tool parking station if no torque support is available If this is not observed serious consequential damages may be the res...

Страница 4: ...lts on the parking arms must be in the standard assembly variant shown corresponds to the delivery state 3 3 Vertical parking 95815 95818 standard assembly variant rear parking Parking arms Bearing le...

Страница 5: ...elow does not correspond to the delivery state Standard assembly variant By removing the retaining ring it is possible to convert the bearing bolts and limiting bolts to a special assembly variant for...

Страница 6: ...check the horizontal position of the placement head with a precision spirit level 4 2 Tool parking station with frame and without level setting In the first step the frame should be affixed to the st...

Страница 7: ...7 4 4 Drill pictures for level settings...

Страница 8: ...king station from the crane and mark out the 4 attachment points on the ground Establish attachment points and use customer specific anchors an example of such an anchor is shown Secure the tool parki...

Страница 9: ...the following pictures determine the status of the tool parking station with a precision spirit level in both X direction and Y direction horizontal and vertical horizontal tool parking station X dire...

Страница 10: ...ertical The tool parking station can now be removed from the crane Secure setting screws with the groove nuts with hook wrench secured with Schnorr lock washers Always check the vertical position of t...

Страница 11: ...velling bush Insert screw with replaced levelling bushes into the locations where the screws with the spacer bushes diagonal were removed earlier This applies to horizontal and vertical parking statio...

Страница 12: ...g head that was aligned earlier This must occur with an attached tool which is not illustrated here To do so a ruler is placed flush on the parking head and the distance between the surface of the pla...

Страница 13: ...til the optimal position of the tool is achieved Always measure out and check the optimal position of the tool as a final step More than one torque support is used in the case of highly asymmetric too...

Страница 14: ...angle then the tool side must be realigned with the aid of the torque support The torque support is adjusted in terms of length such that the ruler touches both edges of the locking ring equally All i...

Страница 15: ...measuring the optimal position of the tool takes place as often as required until the optimal position of the tool is achieved Always measure out and check the optimal position of the tool as a final...

Страница 16: ...ment INCORRECT CORRECT CORRECT INCORRECT INCORRECT INCORRECT CORRECT INCORRECT FALSCH INCORRECT LSCH FP side Tool 90 90 90 FP side FP side FP side FP side 90 90 90 Tool Tool Tool FP side Tool FP side...

Страница 17: ...liability in cases of negligent acts resulting in damage or injury General The torque support should be affixed at a suitable location depending on the type of parking arm pin bushing bolt bar guide...

Страница 18: ...the vertical alignment of the coupling plane e g with a back square see Aligning the tool parking station vertically 5 2 Horizontal parking Affixing the torque support should be done such that the co...

Страница 19: ...he adjustment of the opening angle depends on the scope of delivery Example for infinity variable adjustment of the opening angle between 0 and 135 of flap covers for horizontal parking stations Examp...

Страница 20: ...e opening angle rotate the adjusting screw counter clockwise Make sure that the opening angle is never placed below the 0 position 7 Inspect 1 Is the parking head horizontally or vertically aligned Us...

Страница 21: ...back square to see whether the coupling plane of the tool side is aligned horizontally To do so place the instrument on the milled edge of the parking head and check for parallelism Horizontal alignm...