Petring Energietechnik GmbH – Paderborner Str. 76 – 33189 Schlangen
Tel: +49 5252 989440 Mail: [email protected]
24
4.1 Technical details: electrical connection – supply line
Electrical connection: supply line
1.
Please open your wallb-e eco 2.0 to connect the supply line.
2.
To wall mount your wallb-e eco 2.0 please use:
c)
Please use the holes
a)
, as seen in the picture below.
d)
Alternatively use the pre-cut holes
b)*
, as seen in the picture below.
a.
Please
make sure
to use the included sealing caps if you are using the
pre-cut holes (b) to maintain the protection class IP65. Not using the
sealing caps might lead to water entering the internal switch cabinet.
3.
Please connect your supply line according to your wallb-e eco 2.0 variant. Use the
recommendations and instructions of chapter “4.1 Electrical connection- conditions
and 4.1 Technical Details: electrical connection – supply line”
4.
Please note: You are free to choose any of the pre-cut holes to install the supply line
– use a screwdriver to remove the covers.
Electrical connection: 3,7kW to 22kW
Supply line
(Input
terminal X1)
wallb-e eco
2.0 3,7kW
wallb-e eco 2.0
4,6kW
wallb-e eco 2.0
7,4kW
Supply line
(Input terminal
X1)
wallb-e eco 2.0
11kW
wallb-e eco
2.0 11kW
brown or
black
L1
L1
L1
brown
L1
L1
blue
N
N
N
black
L2
L2
green
/yellow
PE
PE
PE
grey
L3
L3
blue
N
N
green
/yellow
PE
PE
The installation, connection and initial start-up must be performed by trained personnel
with corresponding abilities.