Assembly Instructions
21
Deck Discharge Chute Installation
(GHS Rear Discharge Models Only)
Mount the discharge chute hinge on top of the deck
discharge opening using two (2) 1/4-20 x 1/2 in. but-
ton head socket cap screws and 1/4-20 ESNA nuts.
Position the screws with the heads inside the chute
and the nuts on the outside. Attach spring for tilt-up
action from chute to bracket on deck.
Nut on Top
Carrier Frame
Tube Sockets
Attach
Guard
Attach
Chute
Discharge Chute and PTO Shaft Guard
Installation on Rear Discharge Deck
Deck Discharge Deflector Shield Installation
(Side Discharge Models Only)
Attach the side discharge deflector shield using two
(2) 3/8-16 x 1-1/4 in. bolts, 3/8-16 ESNA nuts, and
3/8 in. wave spring washers. The wave washers fit
between the two hinging surfaces. Tighten the nuts
until the shield moves freely but is not loose.
WARNING
DO NOT operate the machine without the
grass deflector shield attached and in the
lowest possible position.
Attach Shield
Discharge Shield Installation
on Side Discharge Deck
PTO Shaft Guard Installation
Position the shaft guard as shown and mount with
two (2) 1/4-20 x 1/2 in. bolts.
Содержание C19i
Страница 80: ...76 Operator s Notes ...
Страница 81: ...77 Operator s Notes ...
Страница 82: ...78 Operator s Notes ...