7
Figure 1b Typical Installation
Submersion Electrode
TO
110 VOLT AC
OUTLET
TO
SANITARY
SERVER
COOLING
TOWER
OPEN
SUMP
CIRCULATION
PUMP
(X) Unions; installed for replacement of
solenoid or strainer
(Y) ½" Y-strainer
(Z) ½"solenoid
TYPICAL INSTALLATION
SUBMERSION ELECTRODE
(OPTION "A")
VALVE
X
Y
Z
X
VALVE
X
Y
Z X
(OPTION "B")
TO
SANITARY
SERVER
PROBE
NOTE: LOCATION OF SOLENOID VALVE
USING OPTION "A" OR OPTION "B"
DEPENDS ON SYSTEM CONFIGURATION.
DETAIL OF
PROBE ASSEMBLY
TO
CONTROLLER
1" PVC
PIPE
1" NPTF PVC
COUPLING
CLIP PROBE
ASSEMBLY TO
SUMP WALL FOR
EASY REMOVAL
FOR CLEANING
¾" PROBE
IN PVC TEE
INSTALL APPROXIMATELY
HALF-WAY IN SUMP VOLUME
AVOID INSTALLATION NEAR
PUMP SUCTION INLET
CHEMICAL
PUMP
CHEMICAL
TANK
Cooling Tower Controller