46
Application example: Starterkit880_App1_FUP.pro
WAGO-I/O-SYSTEM 750
750-880 ETHERNET Programmable Fieldbus
Quickstart Reference
Version 1.0.0
4.7.1
Starting the Program
1.
Click
Login
in the
Online
menu to load this program to your fieldbus
controller.
2.
Then start program execution in the fieldbus controller via the menu item
Online > Start
.
3.
Now select the menu item
Online > Create bootproject
to create a boot
project. The program is now automatically loaded when restarting the
fieldbus controller.
4.
Switch the Operating mode switch for the fieldbus controller to the top
position (RUN) so that the fieldbus controller automatically starts up during
a restart.
Figure 51: Operating mode switch in RUN position