Start
up
10
0241886
– HiCoat-ED Pump
08/2008
2.3.2 HiCoat-ED Pump - P
Caution
Deactivate the high voltage!
Proceed as follows:
1. Check that the high voltage has been
deactivated.
2. Connect the feed air and dosage air.
3. Disconnect powder feed hose
S
,
plug-in nipple
F
for the feed air and
coupling
D
for the dosage air from the
HiCoat-ED Pump - P.
4. Pull the HiCoat-ED Pump - P out of the
injector connection.
5. Blow through the HiCoat-ED Pump - P
from the powder intake
A
with spurts of
compressed air and clear of all powder
residue or deposits.
6. Connect the powder feed hose
S
, plug-
in nipple
F
for the feed air and coupling
D
for the dosage air to the HiCoat-ED
Pump - P again.
7. Check the grounding before re-starting.