Operation
PG 2A / 3A
20
wc_tx000177gb.fm
4
Operation
4.1
Preparing the Machine for First Use
Preparing for first use
To prepare your machine for first use:
4.1.1
Make sure all loose packaging materials have been removed from the
machine.
4.1.2
Check the machine and its components for damage. If there is visible
damage, do not operate the machine! Contact your Wacker Neuson
dealer immediately for assistance.
4.1.3
Take inventory of all items included with the machine and verify that
all loose components and fasteners are accounted for.
4.1.4
Attach component parts not already attached.
4.1.5
Add fluids as needed and applicable, including fuel, engine oil, and
battery acid.
4.1.6
Move the machine to its operating location.
Содержание PG 3A
Страница 1: ...Operator s Manual Pump PG 3A 5000184874 08 0511 5 0 0 0 1 8 4 8 7 4 EN...
Страница 6: ......
Страница 16: ...Labels PG 3A 16 wc_si000519gb fm 2 Labels 2 1 Label Locations wc_gr000833 A C D E G H F B...
Страница 40: ...Emission Control Systems Information and Warranty 40 wc_tx001753gb fm...
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......