BA D18 us* 1.1 * D18i400.fm
4-15
Putting into operation 4
Protection (on left and right of rollbar).
Assembly:
Install the sunshield with at least two qualified persons.
1. Remove the rotating beacon.
2. Route the cable for the rotating beacon through the opening in the roof.
3. Insert the assembly brackets
D
through the openings in the roof and
tighten screws
E
to 87 Nm (64 ft.lbs).
4. Insert extensions
C
through the openings in the roof and tighten them
to 130 Nm (96 ft.lbs) on the rollbar.
5. Tighten bracket
F
on extension
C
.
6. Install the rotating beacon.
Fig. 76
B
Fig. 77
C
F
Fig. 78
E
D
Содержание DW100
Страница 18: ...1 8 BA D18 us 1 1 D18v100 fm 1 Foreword Notes...
Страница 46: ...3 8 BA D18 us 1 1 D18e300 fm 3 Introduction Warning labels Fig 9...
Страница 50: ...3 12 BA D18 us 1 1 D18e300 fm 3 Introduction Information labels Fig 20...
Страница 54: ...3 16 BA D18 us 1 1 D18e300 fm 3 Introduction ANSI label option Fig 36...
Страница 60: ...3 22 BA D18 us 1 1 D18e300 fm 3 Introduction Notes...
Страница 144: ...6 10 BA D18 us 1 1 D18t600 fm 6 Transportation Notes...
Страница 200: ...8 8 BA D18 us 1 1 D18b800 fm 8 Malfunctions Notes...
Страница 216: ...9 16 BA D18 us 1 1 D18t900 fm 9 Technical data 9 15 Dimensions Front skip overview...
Страница 218: ...9 18 BA D18 us 1 1 D18t900 fm 9 Technical data Swivel skip with rollbar overview...
Страница 220: ...9 20 BA D18 us 1 1 D18t900 fm 9 Technical data Swivel skip with cabin overview...
Страница 222: ...9 22 BA D18 us 1 1 D18t900 fm 9 Technical data...
Страница 226: ......
Страница 227: ......