MIO-H29RRXS004270 Rev D
G&B Specialties Inc. 535 West 3
rd
Street, Berwick, PA, USA Tel: (570) 752-5901 Fax: (570) 752-6397
US Field Service: 570-441-6988; CAN Field Service 570-854-0482; www.rafna.com
-16-
4.
Pump the emergency hand pump handle to move the railgear. It will require 50 to 100 full
strokes to fully raise or lower each railgear.
5.
Return the control valve handle to the middle position.
6.
Remove and store the locking cable holding collar and the hand pump handle.
7.
Ensure the railgear lock pins are fully engaged as required by the procedure.
S
ERVICE OF
H
YDRAULIC
K
IT
The hydraulic kit must be serviced regularly to avoid damage to the equipment.
The recommended oil for the railgear hydraulic system is DEXRON III or equivalent. In extremely
cold weather areas/seasons, Tellus S4 VX32 or equivalent may be used.
Table 1: Recommended Service Schedule
Service Required
Initial 100
km
(62 Miles) of
road and/o
r
rail u
se
Dail
y
Weekly
Monthly
Inspect hydraulic kit fasteners (re-torque if required)
Inspect all hydraulic fittings and hoses for leaks and wear.
Check oil in hydraulic reservoir. (fill with railgear raised if
req’d)
Check emergency hand pump