38
Planning and performing the TailGUARD™ installation
Planning and performing the TailGUARD™ installation
9
Planning and performing the TailGUARD™
installation
The installation of TailGUARD™ should be planned in advance with the aid of a checklist provided by WABCO. This
checklist can be found in Section 11.3 of the system description for TailGUARD™ for Truck & Bus.
Based on
the information given in the checklist,
informative photographs, in particular of the lifting and tipping mechanism of the respective refuse collection
vehicle,
as well as the measurements for the intended positions of the ultrasonic sensors,
WABCO prepares an individual set of parameters for TailGUARD™ that can be loaded into the Electronic Extension
Module using the TEBS E Diagnostic Software.
To be able to write this set of parameters to the ECU, a PIN 2 is required as access authorisation for this protected
function.
A PIN 2 authorisation can be acquired by taking the two e-learning courses
"Trailer EBS E" (WABCO product number: 200 300 104 0) and
"Trailer EBS E1 to E2" (WABCO part number: 200 300 114 0)
and completing them successfully.
Содержание TAILGUARD
Страница 1: ...TAILGUARD FOR REFUSE COLLECTION VEHICLES...
Страница 2: ...2...
Страница 40: ...40 Notes...
Страница 41: ...41 Notes...
Страница 42: ...42 Notes...
Страница 43: ......