WAAREE PV Modules Скачать руководство пользователя страница 7

WEL/ IM/ 05/ 18.03.2016 

 

 

 

 

Clearance  between  the  Module  frame  and  the  mounting  surface  is  required  to  allow  cooling  air  to 

circulate around the back of the Module. This also allows any condensation or moisture to dissipate. The 
Module should never be sealed to the mounting surface with sealant that prevents air from circulating 
under  the  Module.  For  roof  mounted systems,  provide  adequate  rear  ventilation  (100mm:  4inch gap 
minimum) for cooling of Modules. 

  

Please contact WAAREE’S authorized representative for any questions regarding mounting profiles for 

Modules. 

 

 

 

SPECIFICATIONS

 

 

 

Please refer latest Module datasheet for Specifications. 

 

 

SOLAR PV MODULE MOUNTING GUIDELINES

 

 

General Mounting Guidelines:

 

 

 

The Module should be facing true south in northern hemisphere and true north in southern hemisphere 

for maximum power production. 

 

We  recommend  leaving  a  space  of  at  least  10  mm  between  two  Modules  considering  linear  thermal 

expansion of the Module frames. 

 

Since sparks may occur, do not install the Module where flammable gases or vapors are present. 

 

During  installation  all  local  and  national  electrical  and  building  codes  and  regulations  shall  be  strictly 

observed. 

 

Avoid using a mounting method that will block the drainage holes in the Module frame. 

 

Do not install SPV Modules in a location where they will be immersed in or continually exposed to water. 

 

Site-specific  loads  such  as  wind  and  snow  need  to  be  taken  into  consideration  to  ensure  that  the 

pressure of such a load does not exceed the specified maximum load. 

 

Always  abide  by  the  instructions  and  safety  precautions  included  with  the  Module.  The  mounting 

structure and all hardware like bolts, nuts and washers should be of stainless steel so as to eliminate the 
possibility of rust. 

 

When installing a free standing ground mounted system, be sure to select the appropriate height of the 

support  Module  mounting  structure.  It  is  also  important  to  select  the  appropriate  height  of  the 
mounting system to prevent the lowest edge of the Module from being covered by snow for a long time 
in areas that experience heavy snowfall. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание PV Modules

Страница 1: ...fice 602 Western Edge I Off Western Express Highway Borivali E Mumbai 400066 Maharashtra India Tel 91 22 66444400 waaree waaree com Factory Address Plot No 231 236 Surat Special Economic Zone Diamond...

Страница 2: ...CAUTIONS FOR UNPACKING HANDLING STORAGE OF PV MODULE 5 CLIMATIC CONDITIONS 6 NOTES ON INSTALLATION 6 SPECIFICATIONS 7 SOLAR PV MODULE MOUNTING GUIDELINES 7 GROUNDING 10 ELECTRIC WIRING 11 CABLE PROTEC...

Страница 3: ...ed on our knowledge and experience and is believed to be reliable but such information including product specifications without limitations and suggestions do not constitute a warranty expressed or im...

Страница 4: ...d by qualified personnel only Children and unauthorized persons should not be allowed near the installation of PV Modules Use Module for its intended function only Be sure that all other system compon...

Страница 5: ...e Modules Avoid Module mishandling during unloading Do not stack more than the maximum amount of allowable pallets on top of each other At the installation site take care to keep Modules and particula...

Страница 6: ...o the Module output NOTES ON INSTALLATION Please read this guide completely before installation or use of the Modules Modules shall be mounted with the orientation and tilt angle required for consiste...

Страница 7: ...dule frames Since sparks may occur do not install the Module where flammable gases or vapors are present During installation all local and national electrical and building codes and regulations shall...

Страница 8: ...Aluminium Frame 2 M6 Stainless bolts 3 Flat Stainless washer 4 Spring Stainless washer 5 HEX Stainless Nut b Mounting guidelines for Clamping of Modules Each Module must be securely fixed to the mount...

Страница 9: ...fety it is better to follow the clamp manufacturer s recommendations Clamp types Mid clamps They hold each neighbouring panel on the purlin End clamps They hold the panel at fringes at their position...

Страница 10: ...racks must be properly grounded in accordance with respective national electrical code The earth grounding connection shall be done by a qualified electrician The longer sides of the Module frames are...

Страница 11: ...n accordance with applicable electrical codes All wiring should be done by a qualified licensed professional Wiring should be protected to help ensure personal safety and to prevent its damage Modules...

Страница 12: ...e with appropriate precautions e g locate them within plastic conduit Avoid exposure to the direct sunlight Ensure that the cables will be away from areas where water can form puddles When disconnecti...

Страница 13: ...the frame do not treat back sheet and front surface of the Module with paint and adhesives Do not artificially concentrate light on the Module GENERAL SAFETY Follow all permission installation and in...

Страница 14: ...late on the surface of the Module This can reduce the optimal output performance of the solar Modules Normally the accumulated dust can be washed with water but in some instances some maintenance is r...

Страница 15: ...irt which is not easily removed by dry cleaning Do not clean or spray water at the Junction Box or any area on the backside of the Module Frequency of Cleaning will vary depending upon any special con...

Отзывы: