background image

WEL/ IM/ 05/ 18.03.2016 

 

10 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
Note: - 

The clamp position must be in range L/

8 ≤

 e 

 L/4, 

a≥

 6cm

 

 

 

GROUNDING

 

 

 

All  Module  frames  and  mounting  racks  must  be  properly  grounded  in  accordance  with  respective 
national  electrical  code.  The  earth  grounding  connection  shall  be  done  by  a  qualified  electrician.  The 
longer sides of the Module frames are equipped with predrilled Earthing holes in their centre. 

 

2400 Pa 

5400 Pa 

Fix

in

g w

ith

 Nu

t-

Bo

lts

 

  

Fix

in

g w

ith

 C

la

m

pi

ng

 sy

st

em

 

 

 

 

 

Содержание PV Modules

Страница 1: ...fice 602 Western Edge I Off Western Express Highway Borivali E Mumbai 400066 Maharashtra India Tel 91 22 66444400 waaree waaree com Factory Address Plot No 231 236 Surat Special Economic Zone Diamond...

Страница 2: ...CAUTIONS FOR UNPACKING HANDLING STORAGE OF PV MODULE 5 CLIMATIC CONDITIONS 6 NOTES ON INSTALLATION 6 SPECIFICATIONS 7 SOLAR PV MODULE MOUNTING GUIDELINES 7 GROUNDING 10 ELECTRIC WIRING 11 CABLE PROTEC...

Страница 3: ...ed on our knowledge and experience and is believed to be reliable but such information including product specifications without limitations and suggestions do not constitute a warranty expressed or im...

Страница 4: ...d by qualified personnel only Children and unauthorized persons should not be allowed near the installation of PV Modules Use Module for its intended function only Be sure that all other system compon...

Страница 5: ...e Modules Avoid Module mishandling during unloading Do not stack more than the maximum amount of allowable pallets on top of each other At the installation site take care to keep Modules and particula...

Страница 6: ...o the Module output NOTES ON INSTALLATION Please read this guide completely before installation or use of the Modules Modules shall be mounted with the orientation and tilt angle required for consiste...

Страница 7: ...dule frames Since sparks may occur do not install the Module where flammable gases or vapors are present During installation all local and national electrical and building codes and regulations shall...

Страница 8: ...Aluminium Frame 2 M6 Stainless bolts 3 Flat Stainless washer 4 Spring Stainless washer 5 HEX Stainless Nut b Mounting guidelines for Clamping of Modules Each Module must be securely fixed to the mount...

Страница 9: ...fety it is better to follow the clamp manufacturer s recommendations Clamp types Mid clamps They hold each neighbouring panel on the purlin End clamps They hold the panel at fringes at their position...

Страница 10: ...racks must be properly grounded in accordance with respective national electrical code The earth grounding connection shall be done by a qualified electrician The longer sides of the Module frames are...

Страница 11: ...n accordance with applicable electrical codes All wiring should be done by a qualified licensed professional Wiring should be protected to help ensure personal safety and to prevent its damage Modules...

Страница 12: ...e with appropriate precautions e g locate them within plastic conduit Avoid exposure to the direct sunlight Ensure that the cables will be away from areas where water can form puddles When disconnecti...

Страница 13: ...the frame do not treat back sheet and front surface of the Module with paint and adhesives Do not artificially concentrate light on the Module GENERAL SAFETY Follow all permission installation and in...

Страница 14: ...late on the surface of the Module This can reduce the optimal output performance of the solar Modules Normally the accumulated dust can be washed with water but in some instances some maintenance is r...

Страница 15: ...irt which is not easily removed by dry cleaning Do not clean or spray water at the Junction Box or any area on the backside of the Module Frequency of Cleaning will vary depending upon any special con...

Отзывы: