VWR
CO2 Incubator Basic |
39
Operation
Preparing the device
The device must only be released for operation after all major measures for the start-up have
been taken (see Chapter 5 “Start-up”).
Prior to starting operation, the following device components must be checked for their correct
function:
Gas hoses must be seated tight on the connecting filter and must be secured using a hose
clamp.
The access port must be capped.
The pressure compensation opening must be permeable, its insert must be installed in the
work space.
The glass door seal must not be damaged.
The glass door measurement opening must be capped.
The shelf system components must be installed safely.
NOTE!
Hygiene regulations:
Prior to any operation, the user must clean and disinfect the work space in accordance with the
hygiene regulations set forth by the operator to protect the cultures.
Water supply:
The water tray of the work space can hold up to 3.0 l of processed water. When the running
operation, always keep a sufficient quantity of processed water of the following quality available:
Demineralized and distilled or autoclaved for sterilization
or
Completely deionized and distilled or autoclaved for sterilization
When the water level falls below the lower limit, refill water!
Содержание CO2 Incubator Basic
Страница 1: ...VWR CO2 Incubator Basic 50150229 Revision 0 December 2015 ...
Страница 54: ... Shut down 52 CO2 Incubator Basic VWR Chapter 8 ...
Страница 62: ... Cleaning and disinfection 60 CO2 Incubator Basic VWR Chapter 9 ...
Страница 74: ... Parts and accessories 72 CO2 Incubator Basic VWR Chapter 11 ...
Страница 77: ...VWR CO2 Incubator Basic 75 Technical data Chapter 12 Average gas consumption Figure 24 CO2 consumption ...
Страница 78: ... Technical data 76 CO2 Incubator Basic VWR Chapter 12 ...
Страница 83: ...VWR CO2 Incubator Basic 81 Certificate of decontamination ...
Страница 84: ... Certificate of decontamination 82 CO2 Incubator Basic VWR Chapter 15 ...
Страница 85: ......
Страница 86: ......