2.
Loosen spring tension adjusting nuts to remove
any remaining tension on springs.
Fig. 24
3.
Remove springs from the lifting arm mechanism
and eye bolt.
4.
Reverse procedure to install.
5.
Perform RACK SPRING TENSION
ADJUSTMENT.
V-SERIES HEAVY DUTY BROILERS, DOUBLE DECK AND RANGE MATCH MODELS - REMOVAL AND
REPLACEMENT OF PARTS
Page 11 of 16
F45548 (0715)