– 16 –
F-25114 Rev.A (07-03)
GR SERIES GAS FRYERS - REMOVAL AND REPLACEMENT OF PARTS
5. Remove screws securing basket lift motor to cam
bracket, then remove motor from bracket.
6. Reverse procedure to install and check for proper
operation.
NOTE:
After reinstalling motor keep all wire leads
clear from moving parts.
BASKET LIFT CAM SWITCH
WARNING:
DISCONNECT THE
ELECTRICAL POWER TO THE
MACHINE AND FOLLOW LOCKOUT /
TAGOUT PROCEDURES. THERE MAY
BE MULTIPLE CIRCUITS. BE SURE
ALL CIRCUITS ARE DISCONNECTED.
1. Remove basket lift cover as outlined in “BASKET
LIFT COVERS” under “COVERS AND PANELS”.
2. Remove basket lift tube as outlined under “BASKET
LIFT TUBE”.
3. Disconnect lead wires from cam switch.
4. Remove screws securing cam switch to cam bracket.
5. Reverse procedure to install.
Содержание GRC35
Страница 29: ... 29 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION COMPONENT LOCATION ...
Страница 30: ... 30 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION POWER SUPPLY BOX ...
Страница 37: ... 37 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION ...
Страница 39: ... 39 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION ...
Страница 40: ... 40 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION Junction Box Kleenscreen Filtering System ...
Страница 41: ... 41 F 25114 Rev A 07 03 GR SERIES GAS FRYERS ELECTRICAL OPERATION Frymate Dump Station ...
Страница 48: ... 48 F 25114 Rev A 07 03 NOTES GR SERIES GAS FRYERS ...