— 7 —
Fig. 1
LEVELING
Place a carpenter's level on top of the fryer and level the fryer front-to-back and side-to-side by turning
the adjustable legs.
ELECTRICAL CONNECTIONS
WARNING:
ELECTRICAL AND GROUNDING CONNECTIONS MUST COMPLY WITH THE NATIONAL
ELECTRICAL CODE AND/OR OTHER LOCAL CODES.
WARNING:
DISCONNECT ELECTRICAL POWER SUPPLY AND PLACE A TAG AT THE
DISCONNECT SWITCH TO INDICATE THAT YOU ARE WORKING ON THE CIRCUIT.
WARNING:
APPLIANCES EQUIPPED WITH A FLEXIBLE ELECTRIC SUPPLY CORD ARE PROVIDED
WITH A THREE-PRONG GROUNDING PLUG. IT IS IMPERATIVE THAT THIS PLUG BE CONNECTED
INTO A PROPERLY GROUNDED THREE-PRONG RECEPTACLE. IF THE RECEPTACLE IS NOT
THE PROPER GROUNDING TYPE, CONTACT AN ELECTRICIAN. DO NOT REMOVE THE
GROUNDING PRONG FROM THIS PLUG.
Place fryer as near to its final position as possible. Connect 3 phase line to X, Y and Z of terminal block.
To reach terminal block, remove electric cover plate from fryer.
For each 15
1
/
2
" (39 cm) and 21" (53 cm) section, a 3 phase supply line capable of handling the required
KW at the fryer's rated voltage (208, 240, 480) is needed. Refer to the fryer data plate for this electrical
information.
If a fan interlock is needed, it should be connected to 1 and 2 on the 4 pole barrier strip. 1 and 2 go
to a set of dry contacts on the power switch.
S T R A I N R E L I E F
F I T T I N G
T H I S S I D E O N L Y .
( S t r a i n r e l i e f f i t t i n g
s u p p l i e d b y V u l c a n - H a r t .
C h a i n t o b e s u p p l i e d b y
o t h e r s . )
PL-53583