![Vulcan Attachments V3GS Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/vulcan-attachments/v3gs/v3gs_operation-and-maintenance-manual_1056291012.webp)
11
2.8
Mounting and Dismounting the Hammer
Removal from the carrier
1.
Position the hammer horizontally on the floor and remove the tool.
2.
Stop the carrier engine. Operate boom and hammer controls to release the trapped pressure
inside of the hoses. Wait ten minutes for the oil pressure to drop.
3.
Close the hammer inlet and outlet lines. If quick couplers are used, disconnection
automatically closes the hammer lines.
4.
Disconnect the hoses and plug them as well as the hammer inlet and outlet ports.
5.
Remove the bucket pins and other parts.
6.
The carrier can now be moved aside.
Installation
1.
Install the hammer in the same manner as mounting a bucket, install bucket pins.
2.
Connect the hoses. Hammer inlet port is marked on the back head with “IN” and the outlet
port is marked with “OUT”.
3.
Open the hammer inlet and outlet lines.
Содержание V3GS
Страница 1: ...Hydraulic Breaker Vulcan V3GS Operation Maintenance Manual...
Страница 30: ...7 Parts List 7 1 V3GS Housing...
Страница 32: ...31 7 2 V3GS Hammer Assembly...
Страница 35: ...Version 0711...