ZZ201220, ZZ201222
Rev. 13
Страница 1: ...ZZ201220 ZZ201222 Rev 13 ...
Страница 2: ... production standard ZZ201220 230V 50Hz 60Hz ZZ201222 115V 60Hz WARNING to avoid electric shock hazards the cover should only be removed by authorised personnel CAUTION Do not attempt to crunch anything that is not covered by the list of acceptable media advised in the specifications section of this document IMPORTANT the power on off switch used on this equipment is not an isolating switch it is ...
Страница 3: ...n infringement SOME JURISDICTIONS DO NOT ALLOW THE EXCLUSION OF IMPLIED WARRANTIES SO THE ABOVE EXCLUSION MAY NOT APPLY TO YOU YOU MAY ALSO HAVE OTHER LEGAL RIGHTS WHICH VARY FROM JURISDICTION TO JURISDICTION 6 Limitation of Liability VS SECURITY PRODUCTS LTD SHALL NOT BE LIABLE FOR ANY INDIRECT SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGES OR LOSS INCLUDING DAMAGES FOR LOSS OF BUSINESS LOSS OF PROF...
Страница 4: ... 250 6 5 Operation without Data Logging 7 6 Operation with Data Logging 9 7 How to use the Data Logging Software 12 8 Interrogating the Database 17 9 Printing Records 18 10 Supervisor Screen 20 11 Safety Recommendations 23 12 Maintenance 23 13 EC Declaration of Conformity 24 This document refers to CRUNCH 250 part no s ZZ201220 240 220volts 50Hz 60Hz ZZ201222 115volts 60Hz ...
Страница 5: ...VIRONMENT Temperature 41ºF 104ºF 5ºC 40ºC Humidity 10 to 80 non condensing MOUNTING Free standing table top PACKED DIMENSIONS W x H x D 26 x 19 x 15 69cm x 50cm x 40cm WEIGHT 74lbs 34 kg SHIPPING WEIGHT 86lbs 39 kg COMPATIBLE Windows 8 Windows 7 Windows Vista Windows XP OPERATING SYSTEMS SP3 or higher 32 bit only CONNECTIVITY Bi Universal serial Bus 2 0 Full Speed USB ENVIRONMENTAL PROTECTION Wast...
Страница 6: ...comfortable working height Ensure there are no obstructions to any of the air flow grills which are situated on both the left and right hand sides of the unit and also underneath it Ensure the operating environment is within the limits shown on page 5 3 2 Power Wiring Power connection is made to the CRUNCH 250 in the form of an IEC type electrical lead supplied The user should ensure that their po...
Страница 7: ...ers locating it fully within the Destruction Chamber 4 Close the door and ensure it is fully latched 5 Press the green Destroy button on the right hand side of the display 6 Observe the progress of the destruction cycle in the LCD display 7 When the cycle is complete the Open Door message shows and the Hard Drive can be safely removed from the Destruction Chamber 5 2 Destruction of 3 Full Height H...
Страница 8: ...is open the safety door and check the media type and position and correct as necessary Message user pressed stop In the event that the Operator wishes to stop the machine mid cycle the Stop Reverse button can be pressed The message user pressed stop will be shown in the LCD In order to reverse the Crunch 250 to the Start position the Stop Reverse button must be pressed for more than 3 seconds and ...
Страница 9: ...PC and wait for the VSSP software installation screen to appear If the screen does not appear open My Computer and double click on your CD DVD drive icon to launch the disc menu Click on the VSSP_Logger_Auto exe file The following screen will then appear regarding FTDI Interface Drivers Follow the on screen instructions to install the drivers When the FTDI drivers have been installed If they were ...
Страница 10: ...201220 ZZ201222 Page 10 of 25 Tick the box to confirm you have read and accept the software licence conditions and click NEXT Check the suggested destination is acceptable and click NEXT Select the number of Users and click NEXT ...
Страница 11: ...e destroyed 6 2 Destruction of 3 Full Height Hard drives 1 Prepare the Destruction Chamber as described in 6 1 1 Points 1 and 2 above 2 Open the Data Logging program and click the Find Machine button and the Crunch 250 display will show it is in remote mode controlled by the computer 3 Enter data into the software as required 4 Place the Hard Drive PCB UP PC CARD UP on top of the Adapters locating...
Страница 12: ...display will show it is in remote mode controlled by the computer 3 Enter additional data into the software as required 4 Place the media on top of the Adapters locating it fully within the Destruction Chamber 5 Close the door and ensure it is fully latched 6 Start the destruction cycle by clicking the Destroy button on the screen 7 Observe the progress of the destruction cycle in the LCD display ...
Страница 13: ...nnecting to a Machine 1 Plug one end of the USB lead into the VSSP Degausser Crusher machine 2 Plug the other end of the USB lead into a USB port on the computer that the VSSP Logger program is running on 3 Turn the Degausser Crusher machine on NOTE If this is the first time this machine has been connected to this computer there may be a delay as the USB drivers are installed There may also be var...
Страница 14: ... or crushed various data fields must be filled out NOTE Not all data fields may be mandatory e g they can be left blank this depends upon the settings the supervisor has made for the logger NOTE Not all data fields may be displayed This depends upon the settings the supervisor has made for the logger In the example below all the data fields are displayed and all have text completed NOTE When enter...
Страница 15: ...of the data entry boxes 7 3 2 Media Type The Media Type box has a drop down list which is revealed by clicking on the down arrow on the right of the box Select the required Media Type by clicking with the mouse on one of the entries HDD or SSD NOTE All the information entered in the data boxes will be stored in the database media destruction record together with machine details the time and date o...
Страница 16: ...the key data Record Number Date of Destruction Time of Destruction Media Serial Number Capacitor Voltage Magnetic Field Gauss Result Degaussed Crushed as applicable If there was an error during destruction then the error dialog box will be displayed To clear the error dialog box click the OK button The Media Processed box will now show that the destruction failed 7 5 Closing the Logger To close th...
Страница 17: ...ecting Records To select a record to be viewed click on the record to be viewed in the Media Processed List The record will then be highlighted and the record data shown in the data entry fields above NOTE The DESTROY button is now disabled The above can be repeated for each record that is to be viewed ...
Страница 18: ...ted will then be highlighted Now click the Print button and the normal print dialog box will be displayed Select the printer to which the record is to be sent set the number of copies required and click OK The Record Data is now sent to the printer Page 1 20 06 2014 14 31 28 Media Destruction Record Company Name VSSP Operator Victoria Supervisor Brian Degaussing on Site Yes Media Owner Company Nam...
Страница 19: ...ey down and click the individual records to be printed When you have selected the records to be printed click the Print button the normal print dialog box will be displayed Select the printer to which the record is to be sent set the number of copies required and click OK The Record Data is now sent to the printer NOTE Each record is printed on a separate page 9 3 Resuming Destruction after Printi...
Страница 20: ...nter the Supervisor screen the correct password must be entered The default password is password Note that this is all lower case The password can be changed in the supervisor screen NOTE If supervisor password has been changed please make a note of it Once changed it cannot be reset to the default password even if the program is un installed and re installed If the correct password is entered the...
Страница 21: ...een This allows the supervisor to specify exactly which Data Entry Boxes are to be displayed on the Logger main screen On the Mandatory sub panel a tick box with a tick in it will cause the corresponding Data Entry Box to be Mandatory e g it must contain some data prior to the Destruction button being clicked If the Tick Box is not ticked then the corresponding Data Entry Box is not Mandatory and ...
Страница 22: ...her increase the value of the line spacing set in the data entry box Most printers will require a value of about 70 some printers require a higher value 10 5 Database File Archive The Archive Log File button allows the supervisor to Archive e g store the current log file this also causes a new empty log file to be created Clicking the button will display a standard Windows Save File dialog box The...
Страница 23: ... are worn when handling the crushed media or debris in order to protect hands from sharp edges Swarf It recommended that the Debris Collection Tray is emptied frequently to prevent the build up of swarf inside the Crunch 250 SECTION 12 MAINTENANCE 12 1 Resetting the circuit breaker The Crunch 250 Degasser is not equipped with any on board fuses that require replacement All the systems within the u...
Страница 24: ...VS Security Products LTD ZZ201220 ZZ201222 Page 24 of 25 SECTION 13 EC DECLARATION OF CONFORMITY ...
Страница 25: ...VS SECURITY PRODUCTS LIMITED VS AND ASSOCIATES Unit 17 Pegasus Court 3160 Texas Hill Road North Lane Placerville Aldershot California GU12 4QP 95667 UK USA ...