background image

- 3 -

 

 

 

Start-up and operation: 

 

After applying the operating voltage, the D+ Simulator automatically determines its operating voltage 

range (12 V/24 V). Whilst doing so, the LED flashes red and green alternately. 

The device is then in standby (LED flashed red) and is now ready to operate. 

 

Depending on the position, various switch-off delays or functions can be set with the trimmer. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Setting the switch-off delay: 

 

To set the required switch-off delay, set the trimmer to the corresponding position. 

The switch-off delay specifies how long the D+ signal is maintained after switching the engine off.  

If the switch-off delay is selected appropriately, the D+ signal can be prevented from being 

unintentionally switched off on vehicles with an automatic start-stop system. 

 

 

Position 

Function/ Switch-off 

delay 

Setup 

 

 

10 s 

15 s 

30 s 

60 s 

90 s 

2 min 

3.5 min 

10 

5 min 

 

 

Содержание D+ Simulator Pro

Страница 1: ...and is therefore particularly suitable for vehicles that have an alternator management system which may be for example Euro 6 vehicles With its low power consumption of less than 3mA it meets the req...

Страница 2: ...on side of the device Check the device is mechanically secured Lay cables so that they cannot touch any parts with temperatures over 100 C Fasten cables without any tensile forces Fasten cables so tha...

Страница 3: ...or functions can be set with the trimmer Setting the switch off delay To set the required switch off delay set the trimmer to the corresponding position The switch off delay specifies how long the D...

Страница 4: ...on and voltage After switching on the D signal the voltage may drop back below this threshold alternator management The D Simulator is then controlled purely by vibration again If the device is suppli...

Страница 5: ...d it is not obvious to the non professional user which specific values apply to a device or which regulations must be complied with a specialist must be consulted The user buyer is responsible for com...

Страница 6: ...3 A internal fuse self resetting Switch output switching threshold 13 65 13 85 V 27 3 27 7 V additional voltage detection Switching delay on 4 seconds Switching delay off 10 s 5 min adjustable Operati...

Страница 7: ...o the following standards or normative documents EN55014 1 EN55022 B EN61000 6 1 EN61000 4 2 EN61000 4 3 EN61000 4 4 EN62368 1 EN50498 The product must not be disposed of in household waste The produc...

Страница 8: ...nical changes All rights reserved particularly with regard to reproduction Copyright VOTRONIC 11 2020 Made in Germany by VOTRONIC Elektronik Systeme GmbH Johann Friedrich Diehm Str 10 D 36341 Lauterba...

Отзывы: