background image

• Should the appliance be dropped or suffer a heavy

blow, have it checked immediately by Vortice.

•  The  appliance  must  be  installed  by  professionally

qualified personnel.

• The  electrical  system  to  which  the  appliance  is

connected must conform to applicable standards.

• The  appliance  is  double  insulated  and  therefore

does not need to be earthed.

• The  electrical  power  supply/socket  to  which  the

appliance  is  to  be  connected  must  be  able  to
provide  the  maximum  electrical  power  required  by
the  appliance.  If  it  cannot  do  so,  arrange  for  a
qualified  electrician  to  make  the  necessary
modifications.

• A  multi-pole  switch  must  be  used  to  install  the

appliance.  The  gap  between  the  switch  contacts
must be no less than 3 mm.

• Switch  off  the  system’s  main  switch:    a)  if  the

appliance  does  not  function  correctly;  b)  before
cleaning the inside and outside of the appliance; 
c)  if  you  decide  not  to  use  the  appliance  for  any
length of time. 

• Maintenance/Cleaning:  On  a  yearly  basis,  have

professionally qualified personnel check the level of
grime that has accumulated. If necessary, use a dry
cloth  or  a  brush  to  clean  the  control  components
and fan blades.  Water should only be used to clean
the  adjustment  vents.  Do  not  immerse  the
appliance in water or other liquids.

• Check that the air intake section, situated towards

the outside, is clear. 

• The flow of air or fumes to be carried outside must

be clean (that is free of grease, soot, chemical and
corrosive  agents,  and  explosive  or  flammable
mixtures). 

• The  appliance  must  not  be  used  to  activate  water

heaters,  room  heaters,  etc.  and  it  must  not
discharge into the hot air ducts of such appliances.

• Keep the appliance’s intake and outlet grilles free to

ensure an optimum flow of air.

Specifications for the power supply must correspond
to the electrical data on data plate A 

(fig.5)

.

Air connection

The  regulators  for  bathroom  intakes 

Ø

80  and  the

blanking  plugs  are  fitted  by  pressing  them  onto  the
fan casing and they are interchangeable. It is possible
to  identify  the  two  different  regulator  valves  of  the
regulators (15 m

3

/h or 30 m

3

/h) by their shape (fig. 4).

The vents for the bathrooms, (

Ø 

80) and kitchen 

(

Ø 

125) must be connected to the air extract

with ducts (use only 30m

3

/h valves in the U.K.). 

These ducts must run as straight as possible, with a
a minimum length of 1.5 m of ducts for each extract. 
Ensure  the  pipes  are  positioned  correctly  on  the
regulators. 
Connect the air outlet 

Ø

125 to a roof terminal or an

external extraction grille.

Extract Ventilation rates

For U.K. Market only:

The product is designed to Comply with U.K. Building
Regulations  Approved  Document  F1:  Means  of
Ventilation  System  3  –  Continuous  mechanical
extract.  
The installation rates are:

** As  an  alternative  for  Sanitary  accommodation
ONLY. An opening window equal to 1/20th of the floor
area may be used instead.

The whole building ventilation rates are:

a.  In addition, the minimum ventilation rate should be
not  less  than  0.3  l/s  per  m2  internal  floor  area  (this
includes each floor, e.g. for a two-storey building, add
the ground and first floor areas.
b.  This  is  based  on  two  occupants  in  the  main
bedroom  and  a  single  occupant  in  all  other
bedrooms. This should be used as the default value.
If a greater level of occupancy is expected, then add
4 l/s per occupant.

The  product  should  be  used  in  conjunction  with
Vortice  Flexible  Aluminium  Ducting  or  Vortice  Rigid
Modular Plastic Ducting.

Typical applications

Fig. 6÷8

8

ENGLISH

Room

Continuous extract

Min 

high rate

Min low rate

Kitchen

13 l/s

Total extract rate 
must be at least 
the whole building 
ventilation rate 

Utility room

8 l/s

Bathroom

8 l/s

Sanity 
accommodation

6 l/s

**

Number of bedrooms

in dwelling

1

2

3

4

5

Whole building 

ventilation rate 

a b

(l/s)

13

17

21

25

29

Содержание KIT VORT PENTA OEM CHANTIER

Страница 1: ...VORT PENTA OEM CHANTIER VORTICE LIMITED Beeches House Eastern Avenue Burton on Trent DE13 0BB Tel 44 1283 492949 Fax 44 1283 544121 UNITED KINGDOM VORTICE FRANCE 72 Rue Baratte Cholet 94106 Saint Maur Cedex Tel 33 1 55 12 50 00 Fax 33 1 55 12 50 01 FRANCE VORTICE ELETTROSOCIALI S p A Strada Cerca 2 frazione di Zoate 20067 TRIBIANO MI Tel 39 02 90 69 91 Fax 39 02 90 64 625 ITALIA COD 5371 084 880 1...

Страница 2: ...ego 4 Sicurezza 4 Collegamento aeraulico 5 Applicazioni tipiche 5 Installazione 5 Collegamenti elettrici 5 Possibili altre connessioni 5 Manutenzione pulizia 5 Informazione importante per lo smaltimento ambientalmente compatibile 6 Table of Contents EN Description and operation 7 Safety 7 Air connection 8 Extract ventilation rates 8 Typical applications 8 Installation 9 Electrical connections 9 Ot...

Страница 3: ...uspension wires 1 support By requesting the specific accessory it is possible according to need to convert the appliance into a configuration with up to 5 bathroom regulators by applying 1 bathroom intake Ø 80 KIT VORT PENTA OEM CHANTIER fig 3 It is not available in the UK 1 air outlet Ø 125 1 regulator for kitchen intake Ø 125 2 regulators for bathroom intakes Ø 80 equipped with valves of 30 m3 h...

Страница 4: ...o the electrical data on data plate A fig 5 Air connection The regulators for bathroom intakes Ø 80 and the blanking plugs are fitted by pressing them onto the fan casing and they are interchangeable It is possible to identify the two different regulator valves of the regulators 15 m3 h or 30 m3 h by their shape fig 4 The vents for the bathrooms Ø 80 and kitchen Ø 125 must be connected to the air ...

Страница 5: ...d elec tronic equipment or returned to a retailer on purchase of a replace ment It is the user s responsibility to dispose of this ap pliance through the appropriate channels at the end of its useful life Failure to do so may incur the pe nalties established by laws governing waste dispo sal Proper differential collection and the subsequent re cycling processing and environmentally compatible disp...

Страница 6: ...27 FIGURE FIGURES FIGURES FIGURAS ÁBRA FIGURILE ИЗОБРАЖЕНИЯ 图 图像 像 1 VORT PENTA 2 KIT VORT PENTA 3 KIT VORT PENTA OEM CHANTIER ...

Страница 7: ...28 4 5 6 ...

Страница 8: ...29 7 VORT PENTA KIT VORT PENTA KIT VORT PENTA OEM CHANTIER VORT PENTA KIT VORT PENTA VORT PENTA KIT VORT PENTA VORT PENTA KIT VORT PENTA VORT PENTA KIT VORT PENTA VORT PENTA KIT VORT PENTA 8 ...

Страница 9: ...30 9 10 11 12 13 VORT PENTA KIT VORT PENTA VORT PENTA KIT VORT PENTA VORT PENTA KIT VORT PENTA VORT PENTA KIT VORT PENTA ...

Страница 10: ...31 14 15 VORT PENTA KIT VORT PENTA VORT PENTA KIT VORT PENTA ...

Страница 11: ...32 16 M II I N L N1 L2 3 17 M II N N1 3 L2 I L 17A 18 ...

Страница 12: ...33 19 3 L2 N1 L N 20 Commutazione multipla Multiple switching Conmutación múltiple Többszörös átkapcsolás Comutare multiplă Схема коммутации нескольких таймеров 多 多开 开关 关 ...

Страница 13: ...nterruttore bagno 6 Lampada EN 1 3 positions terminal board 2 Relay 3 C Timer cod 12999 4 Kitchen switch 5 Bathroom switch 6 Lamp ES 1 Regleta de 3 posiciones 2 Relay 3 C Timer cod 12999 4 interruptor en la cocina 5 interruptor en el cuarto de baño 6 lámpara HU 1 3 állású kapcsolóléc 2 Relé 3 C Timer cod 12999 4 Konyhai megszakító 5 Fürdőszobai megszakító 6 Lámpa RO 1 Panou de borne cu 3 poziţii 2...

Страница 14: ...35 22 23 24 ...

Страница 15: ...36 25 26 27 28 ...

Страница 16: ...37 29 ...

Отзывы: