![Vortice HRI MINI EP Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/vortice/hri-mini-ep/hri-mini-ep_instruction-booklet_1051102028.webp)
ENGLISH
Figure 3. Typical room layout
28
The drain pipe must have a continuous minimum fall of 6cm per 1m run.
A condensate connecting point will already be provided as part of the building
design. The position of this point, relative to where the heat recovery unit is to
be installed, is to be checked for any appreciable connection misalignment and
necessary adjustment made before proceeding any further.
NOTE:
The HRI Mini EP unit is pre-configured for drainage.
IMPORTANT:
There must be a sufficiently large visible gap between the
condensate drain pipe termination and the collection point, to prevent
ice buildup.
Figure 4 Condensate drain configuration
3
EXHAUST AIR OUT
FRESH
AIR IN
WARM BATHROOM
STALE AIR EXTRACTED
WARM AIR
INTO RETURN
AIR GRILLE
2100mm
RIGHT HAND DRAIN OUTLET
4
In this left had configuration
the condensate drain pipe
is on the left hand outlet.
Refer to design drawing for
further information.
Содержание HRI MINI EP
Страница 20: ...20 ITALIANO DIMENSIONI Figura 20 Dimensioni HRI MINI EP 20...
Страница 21: ...21 ITALIANO SCHEMA ESPLOSO Figura 21 Schema esploso HRI MINI EP 21...
Страница 39: ...39 ENGLISH DIMENSIONS Figure 20 HRI MINI EP dimensions 20...
Страница 40: ...40 ENGLISH EXPLODED DIAGRAM Figure 21 HRI MINI EP exploded diagram 21...
Страница 41: ......