Checking rotation of propeller.
D9/D12/D16 engine
The.solenoid.connectors.are.factory.fitted.for.left-
hand.rotation.in.forward.gear..The.cable.kit.is.marked.
with.PRIMARY.and.SECONDARY..There.is.no.cor-
responding.mark.on.the.reverse.gear,.so.make.sure.
that.the.connectors.are.properly.fitted.for.your.instal-
lation..
Check.the.adjacent.figures.which.describe.cable.con-
nected.for.left-hand.rotation..
For.right-hand.rotation,.switch.the.cable.connectors.
on.the.gear.shift.solenoids.
Twin installation
Illustration.shows.propellers.seen.from.the.aft.for-
ward..Port.engine,.factory.fitted.lefthand.rotation.and.
starboard.engine.righthand.rotation..
Starboard.
Right-hand.
rotation
Port.
Left-hand.rota-
tion
D9
Reverse gear
ZF280AE/VE, ZF286AE/VE, ZF305AE
The.figures.show.reverse.gear.280A.and.305A.with.
cables.connected.for.left-hand.rotation.in.forward.
gear.
NOTE!.For.ZF280IV.(integrated.V-drive).the.primary.
and.secondary.solenoid.valves.are.inversed.
IMPORTANT!.Apply.low.temperature.grease,.
Volvo.Penta.part.no..1161417-9.in.the.solenoid.
connectors.prior.to.connection.
ZF280AE
Secondary.
valve
Primary.
valve
ZF305AE
Secondary.
valve
Primary.
valve
TROLLING
SECONDARY
PRIMARY
OIL.TEMP.
PRESSURE
REV..PICK-UP
39
EVC-C. .
Installation.procedure,.engine.room
Содержание EVC EC -C
Страница 1: ...EVCEC C Electronic Vessel Control D4 D6 D9 D12 D16 Installation 1 1 B E ...
Страница 2: ......
Страница 135: ...Notes 135 ...
Страница 136: ... References to Service Bulletins Group No Date Concerns 136 ...
Страница 138: ...7745547 English 09 2007 ...