VOLT
®
Floodlights
VFLE 120V Series
INSTALLATION & MAINTENANCE GUIDE
w w w . v o l t l i g h t i n g . c o m
–6–
Step 1
6
Adjust the two screws turn the
fixture left and right, up and
down.
Knuckle Mount
Step2
6
Secure service wire or conduit to the wiring compartment cover with 1/2”
connector (not provided ). Connect white fixture wire to white supply wire,
black fixture wire to black supply wire. Service ground should be attached to
green ground screw provided. Ground must be properly attached to avoid the
risk of electrical shock. Use wire nuts, crimp-on lugs, or other approved devices
to connect all wires, make sure connections are secure and that no loose wire
strands are sticking out of connectors, Secure wiring compartment cover to
fixture. With black and white connections inside the wiring compartment.
Use UL and CUL Listed flexible steel waterproof conduit in trade sizes 1/2 and
UL and CUL Listed Water-proof outlet box cover.