background image

13

Reduction in maximum flue length for each bend

Reduction for bends

Bend

45° bend

90° bend

1.0 metre

1.0 metre

Reduction for bends

Bend

Reduction in maximum flue length for each bend

45° bend
90° bend

0.5 metre
1.0 metre

Vertical flue terminal and accessories

Part No.

Description

Min-Max length

530

531

532

523

524

525

526

527

528

529

Vertical flue terminal

Pitched roof flashing plate

Flat roof flashing plate

90-degree bend

45-degree bends (pair)

500mm extension

1000mm extension

2000mm extension

Telescopic extension

Wall bracket pack (5)

1000 mm

N/A

N/A

N/A

N/A

500mm

1000 mm

2000 mm

350/730mm

208mm

Using the dimensions given in fig. 9 as a reference, mark
and cut a 115mm hole in the ceiling and/or roof.

Fit the appropriate flashing plate to the roof and insert the
vertical flue terminal through the flashing plate from the
outside, ensuring that the collar on the flue terminal fits
over the flashing.
The fixing holes for the wall-mounting bracket should now
be drilled and plugged, an appropriate type and quantity of
fixing should be used to ensure that the bracket is mounted
securely.  Once the bracket has been secured to the wall,
mount the appliance onto the bracket.

IMPORTANT

The vertical flue terminal is 1.0 metre in length and cannot
be cut; therefore it may be necessary to adjust the height
of the appliance to suit or use a suitable extension.
Connect the vertical flue assembly to the boiler flue spigot
using the 100mm clip, gasket & screws (supplied), ensuring
the correct seal is made. The flue support bracket (supplied
with the vertical flue kit) can now be fitted.
If the vertical flue requires extension/s or additional bend/
s, connect the required number of flue extensions or bends

Fig. 9

(up to the maximum equivalent flue length) between the
boiler and vertical flue assembly (see fig. 8).
Ensure that any horizontal sections of the flue system
have a minimum 1º; maximum 3º fall back to the boiler (1º
= 17mm per 1000mm)

NOTE

When cutting an extension to the required length, you must
ensure that the excess is cut from the plain end of the
extension (see fig. 8).  Remove any burrs, and check that
any seals are located properly.
You must ensure that the entire flue system is properly
supported and connected.

4.5.3 TWIN FLUE SYSTEM

The Vokera twin flue system enables greater flue distances
to be achieved (see 4.4.2) than that of a concentric flue
system. It can be used for horizontal or vertical applications,
however the twin flue system must be converted to the
dedicated concentric flue kit for termination. It is essential
that the installation of the twin flue system be carried out
in strict accordance with these instructions.

GUIDANCE NOTES ON TWIN FLUE INSTALLATION

The flue must have a have a minimum 1º; maximum 3º
(1º = 17mm per 1000mm) fall back to the appliance to
allow any condensate that may form in the flue system
to drain via the condensate drain.  Consideration must
also be given to the fact that there is the possibility of a
small amount of condensate dripping from the terminal.

Ensure that the entire flue system is adequately
supported, use at least one bracket for each extension.

The entire flue system must be adequately insulated to
maintain heat within the flue system thereby reducing
the possibility of condensate production.

As the exhaust outlet pipe can reach very high
temperatures it must be protected to prevent persons
touching the hot surface.

The condensate drain pipe must be connected in
accordance with building regulations.

“X”

Twin flue accessories

Part No.

Description

Length

0225805

Horizontal flue terminal

1.0 metre

0225810

Vertical flue terminal

1.0  metre

430

Twin adapter kit

N/A

531

Pitched roof flashing plate

N/A

532

Flat roof flashing plate

N/A

0225815

Condensate drain kit

N/A

0225820

0.25m extension  (pair)

250mm

0225825

0.5m  extension (pair)

500mm

0225830

1.0m  extension (pair)

1000mm

0225835

2.0m  extension (pair)

2000mm

0225840

45º bend (pair)

N/A

0225845

90º bend (pair)

N/A

0225850

Twin bracket (5)

N/A

0225855

Single bracket (5)

N/A

“X”= 202mm

Содержание Mynute VHE

Страница 1: ...INSTRUCTIONS TO BE RETAINED BY USER Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic hot water systems in the UK My...

Страница 2: ...he system 17 5 4 Initial flushing of the system 17 5 5 Pre operation checks 17 5 6 Initiallighting 17 5 7 Checking gas pressure combustion analysis 17 5 8 Final flushing of the heating system 17 5 9 S...

Страница 3: ...chnical helpline for advice should you wish to use the Mynute VHE on a sealed pressurised system This booklet is an integral part of the appliance It is therefore necessary to ensure that the booklet...

Страница 4: ...e temperature selector clockwise to increase the boiler outlet temperature or counter clockwise to reduce the outlet flow temperature 2 digit LED display Displays the current outlet temperature of the...

Страница 5: ...cuitry to ensure flame stability at the burner Once successful ignition has been achieved the electronic circuit increases the gas rate to 75 for a period of 15 minutes Thereafter the boiler s output...

Страница 6: ...sumption Watts 75 Supply V Hz 230 50 Internal fuse 3 15A T for PCB 3 15A F for connections block External fuse 3A 2 7 Flue Details concentric 60 100 Maximum horizontal flue length 60 100mm 7 8m Maximu...

Страница 7: ...ternal external corner or boundary 300 mm I Above ground roof or balcony level 300 mm J From a surface or boundary facing the terminal 1200 mm K From a terminal facing a terminal 1200 mm L From an ope...

Страница 8: ...pes of a smaller size than the appliance gas inlet connection must not be used The installation must be tested for soundness in accordance with BS6891 If the gas supply serves more than one appliance...

Страница 9: ...um heat exchangers is used to protect the boiler and system from the effects of corrosion and or electrolytic action The inhibitor must be administered in strict accordance with the manufacturers inst...

Страница 10: ...tres The distance between the bottom of the F E tank and the highest point of the safety vent pipe must be no less than 500mm The supply of water to the F E tank should be taken from themainswatersupp...

Страница 11: ...people have access including balconies or flat roofs theterminalmustbeprotectedbyaguardofdurable material The guard must be fitted centrally over the terminal RefertoI S 813 whentheterminalis0 5metres...

Страница 12: ...e shall be unrestricted 3A 11 2 ALTERNATIVE CLOSE COUPLED ARRANGEMENT If necessary or if preferred a close coupled arrangement for the feed and expansion pipe work can be used as an alternative to a c...

Страница 13: ...Careshouldbe exercisedwhendeterminingthepositionoftheappliance with respect to hidden obstructions such as pipes cables etc When the position of the appliance has been decided using the template supp...

Страница 14: ...Connect the required number of flue extensions or bends up to the maximum equivalent flue length to the flue terminal see fig 7 8 The flue system should have a minimum of 1 maximum of3 risefromtheboil...

Страница 15: ...17mm per 1000mm NOTE When cutting an extension to the required length you must ensure that the excess is cut from the plain end of the extension see fig 8 Remove any burrs and check that any seals ar...

Страница 16: ...verter box ensuring that the exhaust pipe connects to theexhaustconnectionontheconcentrictotwinconverter Ifnecessarycuttheplainends male ofthetwinfluepipes to allow connection to the concentric to twi...

Страница 17: ...ions 4 6 3 CONDENSE PIPE During normal operation the boiler produces condense which is collected in a trap located in the lower part of the boiler A flexible pipe condense outlet pipe is connected to...

Страница 18: ...wiringdiagrams in section 8 for more detailed information 4 7 3 CONNECTINGTHE MAINS 230V INPUT fig 16 Locateandremovethescrewssecuringtheterminalblock cover 230V Pass the supply cable through the cabl...

Страница 19: ...properly filled and vented Ensure the flue system has been fitted properly and in accordance with the instructions 5 6 INITIAL LIGHTING Ensure the electrical supply to the appliance is switched on En...

Страница 20: ...user Failure to install and commission the appliance to the manufacturers instructions may invalidate the warranty 5 12 INSTRUCTINGTHE USER Hand over all documentation supplied with this appliance inc...

Страница 21: ...ssary the condense trap to ensurecorrectoperation 6 3 REPLACEMENTOFCOMPONENTS Althoughitisanticipatedthatthisappliancewillgiveyears ofreliable troublefreeservice thelifespanofcomponents willbedetermin...

Страница 22: ...NESS CHECK MUST BE CARRIEDOUT 6 11 ELECTRODES CONDENSE SENSOR fig 22 Carry out component removal procedure as described in 6 4 Unclip and remove the air chamber front and RH side covers Disconnect the...

Страница 23: ...bly A locateand remove the 3 external nuts B Replace in the reverse order Ensure all seals are in good condition taking care to ensure they are replaced correctly C Fig 27 A B B A Fig 28 6 15 CONDENSE...

Страница 24: ...wherebyonlythepump will run for 15 seconds then off for 15 seconds and will not fire until this period has elapsed 7 2 3 HEATING MODE WiththeselectorswitchintheONpositionandanyadditional controls time...

Страница 25: ...dswitchtheboilertotheOFFmode To adjust the gas valve you must first ensure that the fan Fig 30 Maximum screw Minimum screw Compensation pipe connection 7 4 2 GAS VALVE MINIMUM SETTING Locate and gentl...

Страница 26: ...mp 0 C 75 CO function time 15 min Flow NTC max temp 0 C 87 High limit thermostat 0 C 97 Burner thermostat 0 C 170 Maximum differential 0 C 35 IGNITION CONTROL VALUE Ignition attempts before L O lockou...

Страница 27: ...verted Final Reset check pump ensure there is sufficient return sensor temperature higher than circulation around heating circuit s thermistors flowsensor temperature AL34 Fan tacho signal fault Final...

Страница 28: ...e channel voltage free time clocks Programmableroomthermostats Externaltwin channelprogrammers Theappliancecan be used in conjunction with typical S Plan Y Plan systems see 8 4 1 8 4 2 please contact...

Страница 29: ...ormer FS Flow thermistor NTC RS Return thermistor NTC AD02A Main PCB CN1 CN5 Connection to PCB high voltage X4 X9 Connection to PCB low voltage F O H T Flow over heat thermostat H E T Heat exchanger t...

Страница 30: ...28 FUNCTIONALDIAGRAM 8 4 1 S Plan with Vokera 2 channel programmer 8 4 2 Y Plan with Vokera 2 channel programmer Fig 33 Fig 34 N L E...

Страница 31: ...E 1 Frame assembly 01005496 18 Cover assembly 10028554 20 Printed circuit board 10029717 21 Led light guide 10028557 26 Instrumental panel 10028551 27 Knob assembly 10028559 31 Case Assembly 01005497...

Страница 32: ...30 Table 2 200 27 200 27 200 580 200 580 36 25 200 200 POS DESCRIPTION 20VHE 25 Pipe 10029590 27 Pipe 10029592 36 Pipe 10029591 200 Washer 5023 580 Connection M 3 4 3 4 10029526...

Страница 33: ...267 9 Pipe 10029515 17 Air venting plug 10029306 25 Siphon 10028405 26 Flexible pipe 10028540 27 Flexible pipe 10027192 71 Pipe 10028430 72 Drain tap 01005137 73 Cock 10028431 247 Washer 5203 476 O ri...

Страница 34: ...de 10027864 6 Condense electrode 10026316 12 Gas pipe 10029607 13 Gas valve 10028538 15 3 4 gas cock 10020897 16 Cover for air box 10028345 19 Glass stopper assembly 10026328 27 Plug 10023805 35 Air g...

Страница 35: ...exchanger assembly 01005443 7 Conveyor 10028536 12 Flue drain connection 10028421 475 Washer 125 10026323 482 Washer 10026366 487 Washer 60 10026345 509 High limit thermostat 10026982 552 Washer 60 10...

Страница 36: ...Maximumgasrate 1 55 kg hr Minimumgasrate 0 39 kg hr Injectorsize 3 6 mm Efficiency SEDBUK 92 6 Band A Emissions CO max mg kWh 215 0 mg kWh CO min mg kWh 10 8 mg kWh NOx max mg kWh 97 1 mg kWh NOx min...

Страница 37: ...appliance data badge 10 7 1 CHECKING ADJUSTINGTHEAPPLIANCEFAN SPEEDS Move the selector switch to the OFF position and remove the 3 selector knobs 10 7 2 ABSOLUTE MAX FAN SPEED LocatetheMAXtrimmer fig...

Страница 38: ...HAT TYPE OF SCALE REDUCER HAS BEEN FITTED FOR THE DOMESTIC HOT WATER MODE MEASURE RECORD GAS RATE 3 hr MAXIMUM BURNER OPERATING PRESSURE IF APPLICABLE mbar COLD WATER INLET TEMPERATURE C HOT WATER OUT...

Страница 39: ...CARD SERIAL No COMMENTS SIGNATURE SERVICE 3 DATE ENGINEER NAME COMPANY NAME TEL No CORGI ID CARD SERIAL No COMMENTS SIGNATURE SERVICE 4 DATE ENGINEER NAME COMPANY NAME TEL No CORGI ID CARD SERIAL No...

Страница 40: ...es vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 099 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited reserve the...

Отзывы: