Installation Instructions
22
User Manual CPM II2066en Rev. C
© BTG 2020
3.1.3.3
FCM Connections
NOTE!
Before installation, ensure that all power to the system has been turned off.
Cable connections must be made by authorized personnel.
1. Insert the signal cables through the cable glands.
2. Connect the cables to the FCM-80 as shown on the following page.
NOTE!
The connection blocks can be released from the connection module for easier
access, as shown in figure 15 below.
3. Connect the shield to the upper connection point on the shield filter module.
CAUTION!
The cable shield must always be connected to the upper connection point on
the shield filter module, and kept separated from the transmitter cable shield.
DANGER
Hazardous voltage
in the equipment
Fig 15 Releasing the
connection blocks
Содержание BTG CPM-1300
Страница 1: ...User Manual CPM Communication Platform...
Страница 18: ...Product Introduction 14 User Manual CPM PI2066en Rev C BTG 2020...
Страница 34: ...Service Instructions 30 User Manual CPM SI2066en Rev A BTG 2020...
Страница 50: ...Parts List 46 User Manual CPM PL2066en Rev A BTG 2020...
Страница 60: ...Appendix 56 User Manual CPM AX2066en Rev C BTG 2020...
Страница 61: ......
Страница 62: ...BTG Instruments AB P O Box 602 SE 661 29 S ffle Sweden Phone 46 533 426 00 www btg com...