05TA Service Manual
SERVICE OPERATIONS
7/24/13
9-20
Capacity Control (Internal) Valve Construction.
A schematic illustration of the internal valve
operation is shown in FIGURE 9-15.
In the normal (full capacity) operating position with the solenoid valve de-energized, the needle
valve is seated on the lower port, and the unloading plunger chamber is exposed to suction pressure
through the suction port. Since the face of the plunger is open to the suction chamber, the gas
pressures across the plunger are equalized, and the plunger is held in the open position by the spring.
When the solenoid valve is energized, the needle valve is seated on the upper port, and the unloading
plunger chamber is exposed to discharge pressure through the discharge pressure port. The
differential between discharge and suction pressure forces the plunger down, sealing the suction port
in the valve plate, thus preventing the entrance of suction vapor into the unloaded cylinders.
The seal on the unloading plunger minimizes any leakage in pressure so that a pumpdown cycle may
be used with the valve either energized or de-energized without excessive compressor cycling.
FIGURE 9-15
Loaded Operation (during freeze).
This capacity control valve is controlled by an electric
solenoid. When the solenoid is de-energized, the valve loads the cylinder bank (2 cylinders) as
shown in the above figure.
Unloaded Operation (during thaw only).
During the thaw cycle, the solenoid coil is energized.
The needle valve is seated on the upper port, and the unloading plunger chamber is exposed to
discharge pressure through the discharge pressure port. The differential between discharge and
suction pressure forces the plunger down, sealing the suction port in the valve plate, thus preventing
the entrance of suction vapor into the unloaded cylinders.
Содержание P118F/HE100
Страница 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M06 05TA Model ...
Страница 10: ...05TA Service Manual TABLE OF CONTENTS vi ...
Страница 20: ...05TA Service Manual INTRODUCTION 7 19 13 1 10 ...
Страница 40: ...05TA Service Manual INSTALLING YOUR TUBE ICE MACHINE 3 7 14 3 18 BLANK PAGE ...
Страница 50: ...5 6 5TA Service Manual START UP AND OPERATION 7 19 13 Blank page ...
Страница 52: ...05TA Service Manual ELECTRICAL CONTROLS 3 10 14 6 2 FIGURE 6 2 Control Panel Components Standard ...
Страница 57: ...05TA Service Manual ELECTRICAL CONTROLS 3 10 14 6 7 FIGURE 6 3 Electrical Schematic All Voltages 50 60 Hz ...
Страница 106: ...05TA Service Manual SERVICE OPERATIONS 3 10 14 9 28 Blank ...
Страница 113: ...05TA Service Manual 10 7 OPTIONS AND ACCESSORIES FIGURE 10 4 Wiring Schematic Mid Size Machine P112 P118 P18XT ...
Страница 114: ...Blank page ...
Страница 115: ...05TA Service Manual TABLES CHARTS 3 10 14 11 1 11 Tables Charts ...
Страница 126: ...05TA Service Manual INDEX 4 15 14 12 4 ...