05TA Service Manual
MAINTENANCE
7/19/13
7-9
For The Manager Who Depends Upon This Machine For Efficient Operation.
“Preventive Maintenance” simply means that you or a delegated employee makes a daily visual
check of your Tube-Ice
®
machine. Here is what to look for and why:
Daily checklist:
1. Is the machine running or is the bin full
2. Bin doors kept closed
3. Thermostat bulb in bracket
4. Ice quality (clarity and uniformity)
5. Does all ice discharge during harvest
6. Cleanliness
7. Unusual noises
Why?
When you make these simple observations on a daily basis, you insure the smooth production
of ice for your facility. When you are aware of the proper operating conditions and observe them on
a daily basis, changes in these conditions can alert you to changes in the operation of the machine
which may require maintenance--long before a service situation arises.
“An ounce of prevention is worth a pound of cure!”
Содержание P118F/HE100
Страница 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M06 05TA Model ...
Страница 10: ...05TA Service Manual TABLE OF CONTENTS vi ...
Страница 20: ...05TA Service Manual INTRODUCTION 7 19 13 1 10 ...
Страница 40: ...05TA Service Manual INSTALLING YOUR TUBE ICE MACHINE 3 7 14 3 18 BLANK PAGE ...
Страница 50: ...5 6 5TA Service Manual START UP AND OPERATION 7 19 13 Blank page ...
Страница 52: ...05TA Service Manual ELECTRICAL CONTROLS 3 10 14 6 2 FIGURE 6 2 Control Panel Components Standard ...
Страница 57: ...05TA Service Manual ELECTRICAL CONTROLS 3 10 14 6 7 FIGURE 6 3 Electrical Schematic All Voltages 50 60 Hz ...
Страница 106: ...05TA Service Manual SERVICE OPERATIONS 3 10 14 9 28 Blank ...
Страница 113: ...05TA Service Manual 10 7 OPTIONS AND ACCESSORIES FIGURE 10 4 Wiring Schematic Mid Size Machine P112 P118 P18XT ...
Страница 114: ...Blank page ...
Страница 115: ...05TA Service Manual TABLES CHARTS 3 10 14 11 1 11 Tables Charts ...
Страница 126: ...05TA Service Manual INDEX 4 15 14 12 4 ...