
05TA Service Manual
INSTALLING YOUR TUBE-ICE
®
MACHINE
3/7/14
3-14
Air-Cooled Connections
(See FIGURE 3-2A for connection sizes)
Follow these procedures to make a tight joint:
1. Silver solder or braze condenser tubing ends to the female Rota-lock connectors.
2. Remove dust caps if used, making sure that component plastic seals are intact.
3. Wipe off connector and spud threaded surfaces with a clean cloth to prevent the inclusion of dirt
or any foreign material in the system.
4. Connector coupling nut should be screwed onto Rota-lock spud using the proper amount of torque.
Spud Size
Amount of Torque
7/8”
50-60 FT LBS
1 1/8”
80-100 FT LBS
1 3/8”
100-110 FT LBS
TABLE 3-6
Rota-lock Connector Torque Ratings
Pressure Relief Valves
Pressure relief valves are installed on the freezer, receiver and the
water cooled condenser. These valves are designed to vent in emergency conditions. This ensures
vessel internal pressure does not exceed maximum allowable pressures.
Vent the relief valve outlet to a safe outdoor location in the approved manner away from people and
building openings. Vent line piping must have drain line at low point to drain conde
nsate from line per ASME Boiler and Pressure Code, Section VIII, Division 1.
PRESSURE RELIEF VALVES MUST BE REPLACED AFTER 5 YEARS OF SERVICE.
BEFORE REPLACING RELIEF VALVE, REVIEW REQUIREMENTS PER CURRENT
LOCAL AND NATIONAL CODE.
VALVE REPLACEMENT SHOULD BE MADE BY PROPERLY TRAINED PERSONNEL ONLY.
NOTE: IF RELIEF VALVE DISCHARGES, VALVE MUST BE REPLACED AFTER DISCHARGING
BECAUSE SETTING OR SEAT TIGHTNESS MAY BE ALTERED.
CONTACT VOGT ICE PARTS DEPARTMENT FOR REPLACEMENT VALVES.
PHONE: 502-635-3000
Содержание P118F/HE100
Страница 4: ...Vogt Tube Ice Machines Installation Service Manual and Parts Catalog 12A4171M06 05TA Model ...
Страница 10: ...05TA Service Manual TABLE OF CONTENTS vi ...
Страница 20: ...05TA Service Manual INTRODUCTION 7 19 13 1 10 ...
Страница 40: ...05TA Service Manual INSTALLING YOUR TUBE ICE MACHINE 3 7 14 3 18 BLANK PAGE ...
Страница 50: ...5 6 5TA Service Manual START UP AND OPERATION 7 19 13 Blank page ...
Страница 52: ...05TA Service Manual ELECTRICAL CONTROLS 3 10 14 6 2 FIGURE 6 2 Control Panel Components Standard ...
Страница 57: ...05TA Service Manual ELECTRICAL CONTROLS 3 10 14 6 7 FIGURE 6 3 Electrical Schematic All Voltages 50 60 Hz ...
Страница 106: ...05TA Service Manual SERVICE OPERATIONS 3 10 14 9 28 Blank ...
Страница 113: ...05TA Service Manual 10 7 OPTIONS AND ACCESSORIES FIGURE 10 4 Wiring Schematic Mid Size Machine P112 P118 P18XT ...
Страница 114: ...Blank page ...
Страница 115: ...05TA Service Manual TABLES CHARTS 3 10 14 11 1 11 Tables Charts ...
Страница 126: ...05TA Service Manual INDEX 4 15 14 12 4 ...