![Vogelsang FX116 Скачать руководство пользователя страница 42](http://html.mh-extra.com/html/vogelsang/fx116/fx116_operating-instructions-manual_1044341042.webp)
Maintena nce plan
42
WBV.PU.003.EN FX116 V1.0
12 Maintenance plan
12.1 Maintenance instructions
ATTENTION!
Carefully follow the following maintenance instructions and, if applicable, those documented in the service
plan
Chap.
“Service plan”.
Safety devices
must be checked on a regular basis for proper function, especially after maintenance and
repair work and before start-up.
Observe and comply with the
maintenance instructions in the relevant documents
Chap. “Relevant
documents”.
If the machine’s
running noise changes
or if vibrations occur
Chap.
“Help in the event of application
problems”.
12.2 Maintenance intervals
ATTENTION!
Carefully follow the following maintenance intervals and those documented in the service plan
Chap.
“Service plan”.
Before start-up:
Check pump/motor (coupling) orientation (base C)
After the first 20 operating hours:
•
Retighten the screws for fastening the pump connectors
•
Retighten the screws and nuts for fastening the machine (without base)
•
Retighten the screws and nuts for fastening the motor and the machine on the base
•
Check fixed screw connection of coupling guard (base C)
•
Check the tightening torque
•
Change gear oil
Every 500 operating hours, at least once every three months:
Check gear oil