EN - 5
English
First, use the supplied screwdriver to loose three screws and detach the dome cover from
the camera base. Then, follow the steps below to install the camera; either to a ceiling or to
a wall.
Hardware Installation
3
Ceiling mount with the bottom base
1. Attach the supplied Alignment Sticker to the ceiling.
2. Through the 10 circles on the sticker, drill 2 pilot holes symmetrically on each side into the ceiling.
Then hammer the supplied four plastic anchors into the holes.
3. Through four holes on the bottom base, insert the supplied four screws to corresponding holes and
secure the bottom base with a screwdriver.
4. Feed the cables through hole A or B. If you want to use hole B, remove the rubber with a screwdriver.
5. Secure the camera base to the bottom base with supplied three screws.
N.C.
485B
485A
AC24V
AC24V
1
2
3
4
5
A
B
Alignment Sticker
Drill hole
At least drill 2 pilot holes
symmetrically on each
side to avoid falling.
Содержание FD7141
Страница 1: ...FD7141 V...
Страница 14: ......