
33
☆
The drilling of holes in the ceiling must be done by the professional personnel.
(160)
Ceiling
Installation stands for main body of the unit
Above 20
Fig 1
Notes:
The dimension for the ceiling openings with * marks can be as large as 910mm. But the
overlapping sections of the ceiling and the decorated surface boards should be maintained at no
less than 20mm
.
E
、
Main body of hoisting air conditioner
[
Fix the hoisting stand firmly
]
Water lever
Tighten (double nuts)
Bolt of one of the angle of outlet pipe is fix
on the angle of the drainage slot
[
Fix the install cardboard
]
[
Fix the gasket firmly
]
Polyethylene pipe
Bolt
(
attachment
)
Center of the ceiling
opening
Bolt
(
attachment
)
Install cardboard
Gasket anchor board
(attachment)
Nut (supplied at scene)
Hoisting stand
Gasket (attachment)
Insert
Fig.2
1
、
The primary step for install the indoor unit.
☆
When attach the hoisting stand on hoisting screw, do use nut and gasket individually at the upper
and lower of the hoisting stand to fix it. The use of gasket anchor board can prevent gasket break
off.
2
、
Use install cardboard
Содержание ACP-18CC50GEI
Страница 2: ......
Страница 3: ...HR BiH Upute za uporabu RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Страница 56: ......
Страница 57: ...SR Korisničko uputstvo RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Страница 110: ......
Страница 111: ...CG Upute za uporabu RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Страница 164: ......
Страница 165: ...AL Udhëzime për përdorim RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Страница 218: ......
Страница 219: ...MAK Упатства за употреба RoHS ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI ...
Страница 272: ......
Страница 273: ...User manual ENG ACP 18CC50GEI ACP 24CC70GEI ACP 36CC100GEI RoHS ...
Страница 274: ...1 1 Names and functions of parts A C P 1 8 C C 5 0 G E I A C P 2 4 C C 7 0 G E I ...
Страница 275: ...2 A C P 3 6 C C 1 0 0 G E I ...
Страница 276: ...3 2 Safety cautions Read the following carefully to assure safe use ...
Страница 277: ...4 ...
Страница 291: ...18 TIMER operation procedure ...
Страница 293: ...20 How to inser t batteries ...
Страница 296: ...23 6 Optimum operation ...
Страница 298: ...25 The following are not troubles ...
Страница 299: ...26 8 Installation notes ...
Страница 300: ...27 9 Care and maintenance Please pull out the power plug after you used the air conditioner ...
Страница 301: ...28 ...
Страница 302: ...29 ...
Страница 303: ...30 ...
Страница 325: ...52 70 C The installation altitude beyond the hight of 1000m ...
Страница 326: ...53 ...
Страница 327: ......
Страница 331: ...3 4 ...
Страница 334: ...3 4 ...
Страница 342: ...3 4 3 4 3 4 ...
Страница 343: ......
Страница 344: ......
Страница 345: ......