background image

 

 

MANUAL (T RA NSL A TION)  

RAY- LG 35X X

 

Page 12  

RAY-LG 35XX 

Version: 1.0

 

 

 

 

 

PNP / NPN

 

Power supply USP 

10…30 VDC 

Power supply GND 

0 V 

Test input HIGH 

> 10 VDC 

Test input LOW 

< 2 VDC 

Output HIGH 

> USP - 2 VDC 

Output LOW 

< 2 VDC 

OSE output HIGH 

3.4…4.2 VDC 

OSE Output LOW 

< 1 VDC 

 

Table 3:

 General value table  

 

 

Start-up 

1. 

The  door  must  be  opened  completely,  and 

the monitored area must be unobstructed. 

2. 

Switch  on  main  power  supply  and  power  up 

the  door  control  unit.  The  LEDs  blink  during 

power up. 

3. 

Check  the  LED  on  both  sensor  bars  (power, 

status). 

4. 

Test  if  the  system  is  working  correctly  by 

letting  the  door  open  and  close,  interrupting 

the  light  during  the  opening  and  closing 

process.

 

LED Status Description Receiver Edge 

green LED  red LED  Sensor status 

 

 

Light curtain free 

 

 

Light curtain interrupted 

 

 

 

Start-Up (slow blinking) 

Internal  Malfunction  (fast 

blinking) 

 

 

No Power or light curtain 

defective 

 

       LED on  

   LED off 

LED blinking 

Table 4:

 LED status description receiver edge 

 

 
 
 
LED Status Description Emitter Edge 

green LED  Sensor status 

 

Power ok 

 

No Power or not within the limits or 

edge is defective 

 

       LED on  

   LED off

 

Table 5:

 LED status description emitter edge 

 

Содержание RAY-LG 35 Series

Страница 1: ...ified Fulfils SIL 2 Without Testing OSE Output T V EC Type Examination Certified Direct Mounting in Door Tracks with Blanking Partial Opening Function High Detection Capability Due to Cross Beams Desi...

Страница 2: ...ny alterations to the device by the buyer installer or user may result in unsafe operating conditions FRABA B V is not responsible for any liability or warranty claim that results from such manipulati...

Страница 3: ...p to 2 5 m 8 2 ft in protection height When the infrared beams are interrupted the output sends a signal to the connected door control unit As soon as the detection area is clear again the output swit...

Страница 4: ...surfaces near to or parallel to the detection area can cause reflections and interfere with the RAY LG s functions Keep a reasonable distance between the sensor edges and any reflective surface A self...

Страница 5: ...g door starts at the topmost beam going downwards There are two ways to achieve blanking When the RAY LG is integrated inside or in this case matching holes need to be drilled behind the side guide th...

Страница 6: ...allel to but not in line with the door panel in front of and behind the guide rail the descending door will not interrupt the active beams Figure 5 2 However blanking may still be required if any obst...

Страница 7: ...Electrical and Mechanical Hazards Electrical shock and unexpected door movement can cause serious injury or death Follow all applicable safety measures Use only specific and approved tools If the RAY...

Страница 8: ...on the sensor bars See Figure 6 2 3 In case of severe disturbances or direct sunlight mount the receiver on the opposite side 4 Mount the receiver bar into the guiding track next to the door control u...

Страница 9: ...m Important Any unconnected not used wire must be separated and isolated Output When an obstruction is detected OBJECT DETECTED the RAY LG output changes after response time t2 When the object leaves...

Страница 10: ...onnecting the gray wire to USP 10 to 30 VDC changes the output logic to DO dark on See Figure 9 If the gray wire is not connected floated the output logic changes to the OSE signal Gray wire Output lo...

Страница 11: ...T the frequency starts again See Timing Diagram p 11 Test Input To fulfill EN ISO 13849 1 2015 the RAY LG with PNP NPN output must be tested by the door controller before each door closing cycle The R...

Страница 12: ...wer up 3 Check the LED on both sensor bars power status 4 Test if the system is working correctly by letting the door open and close interrupting the light during the opening and closing process LED S...

Страница 13: ...tective field is clear of interruption Clean the elements Make sure that the cables and sensor bars are located away from sources of electromagnetic interference Ensure that the emitter and receiver a...

Страница 14: ...surface with a soft towel Make sure the profiles are securely fastened Check the mounting position cable routing and connection of the sensor Disposal Disposal should be done using the most up to date...

Страница 15: ...Natural anodized aluminum Enclosure rating IP68 Cable IP67 Temperature range 40 C 60 C 40 F 140 F Electrical Supply voltage USP 10 30 VDC Current Consumption with 22 elements at 24 VDC 50 mA Output PN...

Страница 16: ...D EN 12453 2017 E Device Applicable standards UL 325 2012 Synchronization and electrical connection Extention cable Length 10 m 33 ft Connector M8 4 pins A coded Diameter 3 5 mm 0 14 in Material PVC b...

Страница 17: ...LG 35XX Page 17 RAY LG 35XX Version 1 0 Dimensions Measurements for 22 elements all dimensions in mm Figure 10 RAY LG 3522 Dimensions mm Measurements for 20 elements all dimensions in mm Figure 11 RAY...

Страница 18: ...c EN 13849 1 2008 Performance Level of the Control Unit c acc EN 13849 1 2008 Please pay attention to the operating manual of the control unit Control Unit OSE C 5024 Supply Voltage USP 24VAC DC Dimen...

Страница 19: ...manufacturing job number eeeee employee number responsible for final test cccccc incremental number Technical Instruction valid from year of manufacture 2019 Disclaimer FRABA B V all rights reserved...

Отзывы: