101
2 [267mm]
101
2 [267mm]
PLACE ONE STRAPPING ASSEMBLY AT BOTH EAVE EDGES OF THE
ROOF AS SHOWN BELOW.
THE STRAPPING WILL OVERHANG THE END RAFTERS BY 10 1/2".
EACH RAFTER HAS A MARK THAT SHOWS WHERE EACH ROW OF
STRAPPING IS PLACED. SET THE BOTTOM STRAPPING TOP EDGE
LINED UP WITH THE MARK AT THE BOTTOM OF THE RAFTERS.
ATTACH THE STRAPPING TO THE ROOF WITH TWO 2 1/2" SCREWS
INTO EACH RAFTER AND ONE 2 1/2" SCREW INTO EDGE OF THE
TRUSS FRAME BETWEEN EACH RAFTER AS SHOWN IN
SECTION
VIEW
.
2 1/2" ROBERTSON SCREWS
48 req
SECTION VIEW
B
MARK
Mt. ORFORD
0041_Mt_Orford_11x14_Instructions_V1.1
TOLL FREE: 1-877-795-7423
EN
STEP 18