3
1
2
"
SECTION VIEW
2 1/2" ROBERTSON SCREWS
19 req
B
PLACE THE THIRD AND FINAL STRAPPING ASSEMBLY AT THE VERY TOP OF
THE ROOF AS SHOWN. ATTACH TO THE ROOF WITH 2 1/2" SCREWS, USE TWO
INTO EACH RAFTER AND ONE INTO THE RIDGE BETWEEN EACH RAFTER AS
SHOWN.
Mt. BLANC
Mt_Blanc_11x11_Instructions_V1.0
TOLL FREE: 1-877-795-7423
EN
STEP 21