24
BOLT (A)
20 mm
Qty: 6
SPRING WASHER (B)
8.2 mm
Qty: 6
ARC WASHER (C)
8.4 mm
Qty: 6
HARDWARE FOR STEP 1:
BOLTS (A)
SPRING WASHERS (B)
LEFT CONSOLE MAST
LEAD WIRE
CONSOLE CABLE
ARC WASHERS (C)
BASE FRAME
RIGHT CONSOLE MAST
ASSEMBLY
STEP 1
A Open
HARDWARE FOR STEP 1
.
B Attach
LEAD WIRE
to
CONSOLE CABLE
and pull
LEAD WIRE
through
RIGHT CONSOLE MAST
. After
pulling the
LEAD WIRE
through the mast, the top of
the
CONSOLE CABLE
should be located at the top
of the mast. Detach and discard
LEAD WIRE
.
C Attach
CONSOLE MAST
to
BASE FRAME
using
3
BOLTS (A)
, 3
SPRING WASHERS (B
) and 3
ARC
WASHERS (C)
.
D
Repeat step C on other side.
NOTE: Do not tighten bolts until step 4 is complete.
NOTE: Do not pinch console cable when placing
the mast onto the base frame.
Содержание T80
Страница 2: ...2 3 ENGLISH 32 FRANÇAIS 62 ESPAÑOL ...
Страница 8: ...8 ...
Страница 9: ...9 BASIC OPERATION ...
Страница 16: ......
Страница 17: ...17 TROUBLESHOOTING MAINTENANCE ...
Страница 33: ...34 FRANÇAIS ...
Страница 39: ...40 ...
Страница 40: ...41 FONCTIONNEMENT DE BASE ...
Страница 47: ......
Страница 48: ...49 DÉPANNAGE ET ENTRETIEN ...
Страница 64: ...66 ESPAÑOL ...
Страница 70: ...72 ...
Страница 71: ...73 FUNCIONAMIENTO BÁSICO ...
Страница 78: ......
Страница 79: ...81 RESOLUCIÓN DE PROBLEMAS Y MANTENIMIENTO ...
Страница 95: ...98 ...
Страница 96: ...99 ...