![VisIC V22N65A-HBEVB Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/visic/v22n65a-hbevb/v22n65a-hbevb_user-manual_1030893019.webp)
VisIC V22N65A GaN Half Bridge Evaluation Board
User Manual USG-022650-004
All the above is subject to T’s & C’s agreed by the parties – VER 3.4
Preliminary Data Sheet: VisIC, Ltd. reserves the right to make design improvement changes at any time.
www.visic-tech.com
User Guide USG-022650-001
Page | 18
5.2.
Typical results of buck converter operation
Test conditions:
Inductor 240uH Sendust E-Core
Switching Freq: 100 kHz, Duty Cycle: 50%
Input voltage: 400V
Dead time: 100ns
Output Power: 5kW
Air cooling
Essential results:
Input: 400V, 12.941A (5.048kW)
Output: 196.69V, 25.36A (4.988kW)
Efficiency: 98.8%
Rise time/fall time of low side voltage
correspondingly: 5nSec/6nSec
Case Temperature (High side switch) 57 ̊C
(a)
(b)
Fig. 10 5kW BUCK (a) main waveforms: mid-point
voltage (yellow), inductor current (pink), low-side gate
(green); (b) power meter short screen